# Large Development Loan Checklist

Large new development loan checklist — entitlements, GC contract, budget, and takeout docs construction lenders request. View or download the PDF.

[Download PDF](/checklists/large-new-development-loan-checklist.pdf) [Get Construction Terms](/newbuild/)

A large new development loan file needs the land and entitlements, 100% construction documents, a priced GC contract, sources and uses, and a written takeout — not a rendering and a handshake.

Construction lenders do not underwrite a pretty site plan. They underwrite **who owns the dirt**, **what the city has already approved**, **who is building it**, and **who pays the loan off** when the building is done. This checklist is the package most banks, debt funds, and construction lenders request on a large ground-up file.

Jaken Finance Group prices qualified construction and bridge files at **8.99%–13.5%** interest-only, with inspected draws and a close target of **10–14 business days** once title, entity, and the civil story are in motion. Land-only pieces stay in the **50%–65%** as-is band. Houses after lot release use a vertical facility — see [new construction loans](/new-construction-loans-for-investors/) and [A&D loans](/acquisition-and-development-loans/).

Use this list before you apply. A missing will-serve letter or an unsigned GMP stalls the file longer than a 25-basis-point argument.

## Who this checklist is for

Sponsors closing a large ground-up construction or vertical development loan. Category: Ground-up construction.

## How Jaken Finance Group reads this file

Jaken Finance Group construction underwriting is asset-based: credit is reviewed, but the land, budget, GC, and exit drive approval. Personal tax returns are not the first thing we open on a qualified investor file — the civil set and sources-and-uses are.

This PDF also covers what **banks and debt funds** still ask for (PFS, tax returns, bonds). Gather those if you may take the same project to a bank construction desk or a permanent takeout later.

Apply on the [new construction form](/newbuild/) or call **(833) 264-7776**.

## What delays this file

-   Architectural set is schematic, not 100% construction documents
-   No will-serve letters — water or sewer capacity is assumed
-   GC contract is a letter of intent, not an executed GMP or lump sum
-   Sources and uses omit impact fees, tap fees, and interest reserve
-   Exit memo says “refi or sell” with no lender, buyer, or absorption support
-   Sponsor resume lists projects they advised on, not projects they built

## How to assemble the packet

1.  **Confirm land control and entitlements.** Collect the purchase contract or deed, title commitment, ALTA survey, zoning approval, and every variance or conditional use permit already issued.
2.  **Lock the construction package.** Attach 100% construction documents, civil plans, geotech, permit status, and an executed GC contract with a line-item budget and draw schedule.
3.  **Write the takeout before you submit.** State whether the exit is a sale, permanent refinance, or lot takedown. Support rents or sale prices with comps or pre-leases — not a brochure.
4.  **Submit the complete file.** Upload the packet on the new construction application so underwriting can start on the first pass instead of chasing exhibits.

Program page: [New construction loans](/new-construction-loans-for-investors/) · Related: [A&D loans](/acquisition-and-development-loans/) · [Subdivision financing](/subdivision-development-financing/) · [Multifamily construction](/multifamily-construction-loans/) · [How to submit a scope of work](/guides/how-to-submit-a-scope-of-work/)

Download or check off

43 items · 9 sections

0 of 43 collected

[Download PDF](/checklists/large-new-development-loan-checklist.pdf) [Open PDF](/checklists/large-new-development-loan-checklist.pdf)

### 1\. Entity & legal documents

-    Formation documents for the borrowing/development entity (Articles of Organization/Incorporation, Operating Agreement or Bylaws)
-    Joint venture / partnership agreement between sponsor and equity partner(s), if applicable
-    Certificate of Good Standing for the development entity
-    EIN confirmation letter
-    Organizational chart / ownership breakdown showing all members with 20%+ ownership and the GC/developer relationship
-    Resolution authorizing the loan and identifying the signer(s)

### 2\. Land & entitlements

-    Land purchase contract or evidence of current land ownership, and title commitment
-    Current survey / ALTA survey
-    Zoning approval and confirmation the proposed use is entitled
-    Recorded plat, if applicable, and any subdivision approvals
-    Copies of all entitlements, variances, and conditional use permits obtained to date

### 3\. Plans, permits & design

-    Full architectural and engineering plans (100% construction documents preferred)
-    Building permit status — issued, submitted, or pending
-    Geotechnical / soils report
-    Civil engineering plans (grading, drainage, utilities)
-    Utility availability/will-serve letters (water, sewer, electric, gas)

### 4\. Construction & budget

-    General contractor qualifications, license, references, and financial statement
-    Executed construction contract (GMP or lump sum) and scope of work
-    Performance and payment bonds, if required
-    Detailed construction budget / sources and uses of funds
-    Construction timeline and draw schedule
-    Contingency reserve amount and funding source

### 5\. Market, pre-leasing & pro forma

-    Third-party market study / feasibility report, if one exists
-    Pre-leasing or pre-sale agreements, letters of intent, or reservation deposits to date
-    Stabilized pro forma with underlying rent, absorption, and expense assumptions
-    Comparable project data supporting rent and sale price assumptions

### 6\. Environmental & site conditions

-    Phase I Environmental Site Assessment (Phase II if warranted)
-    Wetlands delineation and floodplain determination
-    FEMA flood zone determination for the property
-    Any required environmental remediation plan and cost estimate

### 7\. Sponsor / guarantor & development team

Lenders underwrite the sponsor’s completed comparable projects as heavily as the deal itself.

-    Personal Financial Statement (PFS) for each guarantor (20%+ owners)
-    Schedule of Real Estate Owned (SREO) for each guarantor
-    Personal tax returns, last 2–3 years, for each guarantor
-    Credit authorization / consent to pull credit for each guarantor
-    Development track record — completed projects, size, asset type, and outcome
-    Verification of liquidity and reserves available to cover cost overruns
-    Equity commitment documentation (source and timing of equity funding)

### 8\. Insurance

-    Builder’s risk insurance quote or policy
-    General liability insurance for the construction period
-    Workers’ compensation coverage confirmation for the general contractor

### 9\. Additional items commonly requested

-    Impact fee, tap fee, and permit fee schedule from the local jurisdiction
-    Any existing debt on the land and payoff statements, if applicable
-    Exit strategy summary — permanent takeout financing, sale, or refinance plan

### Keep a printable copy

Download or print the checklist for your attorney, CPA, or seller. No email is required.

[Download the PDF directly](/checklists/large-new-development-loan-checklist.pdf).

## Other loan checklists

-   [Commercial & Multifamily Second-Lien Underwriting Checklist](/checklists/commercial-second-lien-underwriting-checklist/) — Commercial / multifamily second liens
-   [DSCR First Mortgage With Subordinate Financing Checklist](/checklists/dscr-subordinate-financing-checklist/) — DSCR first mortgages / subordinate financing
-   [Junior Debt Checklist for Multifamily 5+ Units](/checklists/junior-debt-multifamily-checklist/) — Cash-flowing multifamily / junior debt
-   [Commercial Property Loan Checklist](/checklists/commercial-property-loan-checklist/) — Office, retail, industrial, mixed-use
-   [Assisted Living Loan Checklist](/checklists/assisted-living-facility-loan-checklist/) — Senior housing & RAL
-   [Mobile Home Park Loan Checklist](/checklists/mobile-home-park-loan-checklist/) — Land-lease MHP
-   [Mobile Home Community Checklist](/checklists/mobile-home-community-loan-checklist/) — MHC / amenities / 55+
-   [RV Park Loan Checklist](/checklists/rv-park-loan-checklist/) — Outdoor hospitality

## Frequently asked questions

What documents do I need for a large new development loan?

Land control and title, entitlements and zoning, 100% architectural and civil plans, geotech, will-serve letters, an executed GC contract, a sources-and-uses budget, interest reserve, sponsor track record, and a written takeout. Download the checklist and gather those items before you apply.

Is a large development loan the same as an A&D loan?

No. An A&D loan buys dirt and funds streets and utilities. A large new development loan funds vertical construction on entitled land. Mixing the two budgets is how files stall. Use the A&D page for horizontal work and this checklist for the building.

Do construction lenders require a GC contract before term sheet?

Most do. A priced, executed GMP or lump-sum contract plus the GC license, references, and insurance is how the construction budget becomes real. A handshake bid is not enough for a large file.

How fast can a complete development file close?

Jaken Finance Group targets 10–14 business days on a complete construction file. Bank construction desks often take 45–90 days. Missing entitlements or an unsigned GC contract add weeks on either path.

## Ready to submit a Large new development file?

Bring the completed checklist. A labeled packet gets reviewed faster than a shared drive of unlabeled scans.