# Commercial Construction Loan Lenders by Property Type

Compare commercial construction lenders for apartments, mixed-use and office. See how loan sizing, leasing, draw terms and your exit affect lender fit.

[Request Commercial Financing](/commercial-loan-request/) [Contact Us](/contact-jaken-finance-group-by-email/)

Updated November 2026

Banks and private lenders can fund ground-up apartments, mixed-use projects and offices. Fit depends on the site, loan size, sponsor and exit. A HUD-approved lender is another option for eligible rental housing. If the building has shops or offices, say who will use that space and when rent starts. Show how you would pay off the loan if leasing takes longer.

## Commercial construction loan sizing calculator

Compare your loan request with the limits based on cost and completed value.

### Estimated results

Cost-based limit

$8,400,000

Completed-value limit

$7,800,000

Modeled loan ceiling

$7,800,000

Gap against your request

$200,000

Deal summary How the estimate adds up

-   The lower of the two limits sets the modeled ceiling. Check the lender’s eligible costs, draw terms and any additional limits.

Borrowers

[Submit a commercial construction deal](/commercial-loan-request/?typeOf=Ground-up+commercial+construction)

Brokers with a client deal

[Sign up as a broker](https://brokers.jakenfinancegroup.com)

Start with the lender comparison below. If you already have site control, a line-item budget and a target closing date, [request a commercial construction review](/commercial-loan-request/).

[Compare lender types](#which-commercial-construction-lenders-should-i-approach-first) · [Size the loan](#how-much-can-i-borrow-for-commercial-construction) · [Prepare your package](#what-should-i-send-for-an-initial-lender-review)

## Which commercial construction lenders should I approach first?

| Lender type | First question to ask |
| --- | --- |
| Community or regional bank | Does your construction desk lend on this property type, in this market, at our requested amount? |
| Larger bank CRE team | Does the request fit the size and sponsor requirements of your commercial real estate team? |
| Private lender or debt fund | What is your minimum loan size, and can the draw schedule and maturity work for our project? |
| HUD-approved multifamily lender | Is our rental build eligible for Section 221(d)(4) with the proposed commercial space? |
| Bank and Certified Development Company for SBA 504 | How do you measure the operating business’s share of the building, and how would we fund construction? |

Check the property type, state, loan size and stage on the first call. Ask who will review the file and which facts they still need. Find out how the decision might change if you add retail space, lose a tenant or need a larger reserve.

U.S. Bank lists construction financing as part of its commercial real estate business. It serves sectors including multifamily, office and retail. ACORE Capital lists first-mortgage and mezzanine construction loans. Its published **$45M–$150M single-asset transaction size** puts an $8M request below that range. Trez Capital gives a real example of a private construction loan for apartments in Texas. Check current size, location and property fit directly with any lender. Public references were checked November 19, 2026. [U.S. Bank commercial real estate](https://www.usbank.com/corporate-and-commercial-banking/industry-expertise/commercial-real-estate.html) · [ACORE Capital lending programs](https://acorecapital.com/borrowing-community/) · [Trez Capital apartment construction example](https://www.trezcapital.com/financings/construction-loan-texas)

For FHA-insured financing, find an approved lender on HUD’s list. Section 221(d)(4) covers eligible rental housing construction and major rehabilitation. For mixed-use, ask that lender to check the amount of commercial space and income against the program rules. If your own business will occupy an office or clinic, explore SBA construction financing. [HUD approved multifamily lenders](https://www.hud.gov/hud-partners/multifamily-production) · [SBA construction loans](/sba-construction-loans/) · [SBA 504 eligible uses](https://www.sba.gov/loans/504-loans/)

## What changes when three projects each need $8M?

Take three projects. Each costs **$12M** and needs **$8M** of construction debt. The request is **66.7% of total cost** in all three examples. The lender may count only part of that cost. The type of building also changes how the loan will be repaid.

| Project | What to test first |
| --- | --- |
| 40 rental apartments | Can the projected refinance repay the construction loan if move-ins are slow? |
| Apartments over 4,000 square feet of unleased retail | Could apartment income support the exit while the sponsor carries a vacant storefront? |
| New office with a signed build-to-suit tenant | Does the reserve cover a late delivery, and can the tenant still take occupancy under the lease? |

For apartments, show nearby properties with similar units. Ask your broker or manager for three facts. Show the rents advertised, actual rents after concessions and units leased each month. Two months of free rent can help fill the building. It also pushes collections back while the construction loan is still due. Show when units will be ready and when rent will come in.

Run the [mid-sized apartment construction example](/mid-size-apartment-construction-loans/) if your budget, loan request and projected refinance point to different amounts.

For mixed-use, tell the lender how much of the building is commercial. Start with its share of the total **net rentable area**. Then show the commercial share of **effective gross income**. That is projected income after adjustments such as vacancy. Label your rent and vacancy assumptions. Explain who will deliver the storefront, what work is left to the tenant and who pays. If the building is already standing, see the [mixed-use bridge guide for renovations and lease-up](/mixed-use-property-bridge-loans/).

For a ground-up project with an empty storefront, use the [unleased retail construction example](/mixed-use-construction-loans/) to estimate the cash needed to lease the space and compare two refinance outcomes.

For office, read the delivery section of the lease. Compare it with the build schedule. Check who needs access to the site, what permits are due and what the tenant must accept. If rent starts at acceptance, a late handover may push back payments. Put the delivery deadline, expected certificate of occupancy and first rent date on one schedule. For a building that is already standing, compare [office bridge financing for acquisition or improvements](/office-building-bridge-loans/).

If a tenant has signed for a new office, use the [preleased office construction guide](/office-construction-loans/) to turn the lease delivery dates and landlord work into a funding schedule.

For a [first apartment build with an experienced contractor](/first-time-apartment-construction-loans/), ask which responsibilities the lender needs to see covered by a development principal.

## How much can I borrow for commercial construction?

Ask what limits the loan. **Loan-to-cost (LTC)** divides the loan by the costs the lender accepts. **Loan-to-value (LTV)** divides it by the value the lender uses. Both can cap the commitment. The lender may also reduce the loan based on its exposure in the market, the sponsor’s cash or the likely refinance proceeds.

Take the 40-unit apartment build. Assume the lender caps the loan at 70% of $12M in eligible costs. That limit is **$8.4M**. Also assume the lender caps it at 60% of the completed value of $13M. The lower limit of **$7.8M** controls in this case. The sponsor has **$200K more to fund** than planned. At that loan size, the total equity need is **$4.2M**. If the lender credits $1.2M of net land equity, **$3M** is left to fund in cash.

Ask when the cash is due. Some may be due at closing. The rest may be spread across draws or tied to a milestone. Ask which bills paid before construction count as equity. Find out how much existing land debt comes due at closing. Give the lender a schedule showing how the cash covers each invoice. Test a smaller loan or less land credit with the [construction budget and equity calculator](/ground-up-construction/budgets-equity/).

Ask for the lender’s list of eligible costs before treating a loan-to-cost quote as a dollar commitment. Put that list beside your own uses of funds. Watch for permit costs already paid, developer fees, tenant work and the interest reserve. Ask whether each is eligible, when it can be funded and what evidence the lender needs. A lender may recognize a bill as a project expense but leave the sponsor to fund it.

For instance, an assumed 70% loan-to-cost cap leaves **$8.19M** of capacity on $11.7M of eligible costs. That would be **$210K less** than at $12M of eligible costs. In the 40-unit example, the separate $7.8M value cap would still control. Showing both numbers tells you which change would actually affect proceeds.

If a valuation has already reduced your loan, [calculate the funding gap and compare ways to cover it](/construction-loan-gap-after-appraisal/).

## What should I compare besides the interest rate?

Give each lender the same budget. Ask for the **initial advance** and the amount held for later draws. Find out when interest starts and what balance it accrues on. A $7.8M commitment with $2M at closing leaves $5.8M for later uses. If the land payoff and closing costs are $2.3M, the sponsor needs at least $300K at closing. Check how much of the later funding is set aside for fees, carry or holdbacks.

Review these points with the term sheet in hand:

-   **Equity timing.** When must the sponsor fund cash, and how will the lender recognize eligible work already paid for?
-   **Draws.** Who orders inspections, what supports each request, and how long is the modeled gap between paying trades and receiving funds?
-   **Guaranties.** Who signs for repayment, completion, cost overruns or other obligations? What conditions must be satisfied before each obligation can be released?
-   **Maturity and extension.** When does the loan mature? What fees, reserve balances, construction milestones or leasing tests apply to an extension?
-   **Closing conditions.** Which approvals, leases, documents or deposits must be in place before the lender gives a firm commitment and releases funds?

The [OCC Commercial Real Estate Lending handbook](https://www.occ.gov/publications-and-resources/publications/comptrollers-handbook/files/commercial-real-estate-lending/index-commercial-real-estate-lending.html) explains how banks look at project feasibility, construction advances and completion risk. Your term sheet and loan documents establish how your transaction would work. Use the [term sheet, letter of intent and commitment guide](/commercial-loan-term-sheet-vs-loi-vs-commitment/) to identify what each proposal still needs before closing.

If you are comparing [non-recourse construction loan terms](/non-recourse-commercial-construction-loans/), put a dollar amount and a release condition next to each guaranty.

## Will the lender fund the land and construction together?

Some lenders can finance the land purchase and later construction draws. Can the lender close while permits are pending? How much can fund the land purchase? What must happen before the first construction draw? Give the lender the purchase deadline and any extension rights. List the approvals you have and when you expect the rest.

If acquisition must close first, compare the costs of holding the site until the construction facility can close. Include interest, taxes, insurance, time spent satisfying conditions and expenses for a second closing. If permit timing slips, check how long the land facility lasts and what it takes to refinance it. A low-cost land loan can put pressure on the project if it matures before the construction conditions can be met. For lots that still need infrastructure, compare [acquisition and development financing](/acquisition-and-development-loans/) and confirm which work belongs in the land phase.

If the seller needs an earlier close, compare [ways to buy or control the site before permits](/land-acquisition-before-construction-permits/). For a standing office building, [test what current office income can support](/office-to-apartment-conversion-financing/) before underwriting the conversion.

If you already own the site with a mortgage, see [how to account for land equity and the payoff at closing](/construction-loan-land-equity-existing-mortgage/).

## Can I finance the first phase on its own?

Draw the boundary of the first phase on the site plan. Show which land and buildings will secure the loan. List the roads, utilities, parking and common space that phase one needs to open. Some of that work may also serve later phases. Show when it must be paid for and which budget covers it.

For the 40-unit project, assume the first phase needs the main water connection and most of the access road. These costs come due early even if later phases will benefit. If the first lender funds only part of them, show when the sponsor will cover the rest. Run a second schedule where the later phases start a year late. That helps show whether the first 40 units can open, lease and repay the first loan on their own.

Ask what happens to the remaining land at closing. A lender may need a lien on more than the first building site. Find out whether you can later free a parcel for its own financing and what conditions or payments apply. Confirm access and utility rights with the project team and title provider. These details can affect the next phase even after the first phase is built.

Use the [Phase 1 financing guide](/phase-one-construction-financing/) to price common work and test whether the first building can repay its own loan.

## How do I test the exit before I break ground?

Decide how you will repay the loan and when the money will arrive. For rental apartments, start with **net operating income**. Subtract operating expenses from property income before making loan payments. Size the refinance to both value and debt service coverage. Take out closing costs and compare what’s left with the construction payoff. Ask the permanent lender what records it needs and how much rent it expects to see collected.

For office and mixed-use, calculate rent from the date each tenant is expected to pay. Include free rent, tenant improvement allowances, commissions and unreimbursed expenses. On a sale exit, deduct selling expenses and test a later closing or a lower price. The [construction exit calculator](/ground-up-construction/planning-exit/) lets you compare the estimated proceeds with the payoff. The [draw and interest calculator](/ground-up-construction/draws-interest/) lets you put the cost of a delayed payoff into your funding plan.

If the loan is already in place and the remaining draws are frozen or insufficient, use the [mid-construction refinance and cost-to-complete guide](/mid-construction-refinance/). For completed apartments with a loan deadline, compare an extension and a new loan in the [apartment lease-up refinance guide](/apartment-lease-up-refinance/). For other completed commercial property, start with [commercial refinance options](/commercial-real-estate-refinance/) and include the operating history and maturity date.

## What should I send for an initial lender review?

Prepare a one-page summary the lender can read before opening the full package. Start with the address, property type, units or rentable square feet, requested loan, total project cost and requested closing date. Name the approvals already in hand, the ones still pending and who is responsible for obtaining them.

If this is your first apartment build, show who on the team finished a similar project and what they did. Tell the lender who can make decisions, manage day-to-day work and sign any required guaranty. Ask how the lender will evaluate your experience alongside the contractor’s. If the plan depends on bringing in a partner, allow time to agree on the partner’s role and cash contribution.

Give the lender a dated sources-and-uses schedule showing equity, debt, current land payoff if any, initial funding and draw requests. Attach the available plans, bid and construction schedule. Identify who will own, manage and build the project and what similar work they have delivered. For occupied or preleased commercial space, include the relevant lease, rent start and tenant delivery milestones. End with the proposed exit and the assumptions that need a lender’s confirmation.

Use the [ground-up construction readiness checklist](/ground-up-construction/readiness/) if you are still putting the package together. When you are ready to discuss lender fit, [request a commercial construction review](/commercial-loan-request/). Brokers submitting a client’s project can include the same summary in the [broker portal](https://brokers.jakenfinancegroup.com/).

## Related financing resources

Explore Jaken Finance Group programs and trusted reference material connected to this topic.

### On this site

-   [Commercial real estate financing](/commercial-real-estate-financing/)
-   [Multifamily DSCR vs commercial loan (no unit maximum)](/blog/multifamily-dscr-vs-commercial-loan/)
-   [Mixed-use vs multifamily financing](/blog/mixed-use-vs-multifamily-financing/)
-   [Commercial bridge loan vs SBA loan](/blog/commercial-bridge-loan-vs-sba-loan/)

## Frequently asked questions

Can a first-time apartment developer get a commercial construction loan?

Some lenders will consider a first-time sponsor with experienced development and construction partners, documented liquidity and a supported exit. Show who has completed comparable projects, who makes decisions and who can provide each required guaranty. An experienced contractor can strengthen the file, and lenders also review the sponsor's own role.

Can land count as equity in a commercial construction loan?

It can if the lender accepts the land contribution. Ask which value or cost basis it uses, how existing land debt affects the credit and how much cash must still be funded before draws. Document the deed, acquisition basis and payoff.

Can a construction lender consider mixed-use with unleased retail?

Some lenders will review it. Show how much of the budget is devoted to retail, how long you can carry an empty storefront and whether the apartment income can support the proposed exit on its own. Ask what commercial lease evidence the lender needs.

Can I get a commercial construction loan before my permits are issued?

You can start discussions with a lender while permits are pending. Ask which approvals are conditions for an initial decision, a closing and the first construction draw. If you must buy the site before that sequence works, model a separately financed acquisition and its carry.

Can office construction qualify with a signed lease?

A signed lease can support a build-to-suit request. Lenders still review the tenant's ability to pay, the guarantor if any, landlord work, delivery deadlines and what triggers rent. Share the executed lease and the conditions the project needs to satisfy.

## Ready to fund your next deal?

Get pre-qualified in minutes. Speak with a lending specialist or submit your scenario online.

[Request Commercial Financing](/commercial-loan-request/) [Contact Us](/contact-jaken-finance-group-by-email/)

Or call [(833) 264-7776](tel:8332647776)