# Ground Up Construction Loans No Experience

Ground-up construction loans on qualified files — funded on scope, budget, and exit nationwide. Jaken Finance Group. Submit your build scenario.

[Pre-Qualify Today](/scenario/) [Contact Us](/contact-jaken-finance-group-by-email/)

Updated November 2026

**Ground up construction loans no experience** is one of the most searched phrases in investor lending — and one of the most misunderstood. Most banks want a builder resume before they fund dirt. Jaken Finance Group takes a different view: **fund the project on scope, budget, contractor credibility, and exit strategy** — not just how many ground-up builds you have closed before.

First-time sponsors with a **licensed GC**, realistic **as-completed value**, and documented **liquidity** can access new construction capital when the numbers work.

Planning an apartment building? See [what commercial lenders look for on a first apartment development](/first-time-apartment-construction-loans/), including the GC’s role and who can fund cost overruns.

## What “no experience” actually means to underwriters

Lenders are not asking whether you have flipped ten houses. They are asking whether **this build** will finish on budget and sell or refi on time:

| Underwriting focus | Why it replaces a resume |
| --- | --- |
| **Plans & specs** | Architectural drawings, permits path, zoning compliance |
| **Budget** | Line-item hard and soft costs with contingency |
| **Contractor** | Licensed GC, insurance, draw inspection agreement |
| **Land / basis** | Purchase price or equity in lot |
| **Exit** | ARV comps, presale, or DSCR refi path post-CO |
| **Guarantor liquidity** | Carry, overruns, and interest reserve |

If your pitch is “I have never built anything but trust me,” expect pushback. If your pitch is “here are stamped plans, three GC bids, and a 14-month sell-out comp set,” experience becomes secondary.

## Ground up construction vs. fix-and-flip rehab

| Factor | Fix-and-flip rehab | Ground-up construction |
| --- | --- | --- |
| Collateral | Existing structure | Land + improvements in progress |
| Draws | Rehab milestones | Foundation, framing, MEP, CO |
| Timeline | 3–9 months typical | 9–18+ months typical |
| Risk | Scope creep in existing shell | Permitting, weather, subcontractor coordination |

Investors crossing from flip to build should review [new construction loans Chicago](/new-construction-loans-chicago/) for a metro example and [loan programs overview](/real-estate-financing-solutions-loan-options/) for the full product menu. **Step one:** acquire the lot with [vacant land loans](/vacant-land-loans-raw-land-financing-investors/) before vertical construction begins. Creating several lots at once is a [subdivision](/subdivision-development-financing/) problem first — record the plat, then build.

## How Jaken Finance Group structures ground-up loans

-   **Entity vesting** — LLC holds title; personal guaranty from managing members
-   **Interest-only** during construction with **draw inspections** at milestones
-   **Exit flexibility** — sell to retail/end buyer or refi to [DSCR](/dscr-loan-for-investment-property/) on rent-ready product
-   **Nationwide** — not limited to Chicago; submit any state file for review

[Submit your new construction application](/newbuild/) with plans, budget, and timeline — or [get approved](/scenario/) first.

## Strengthen a first-time ground-up file

1.  **Hire the GC before you ask for money** — lender-ready bids beat “GC TBD”
2.  **Model 10%–15% contingency** in the budget line items
3.  **Document land basis** — purchase contract or equity statement
4.  **Show exit math** — as-completed comps within 0.5 miles, same product type
5.  **Stack reserves** — interest carry plus six months of debt service post-CO

For investors pairing construction with rental exit, see [BRRRR strategy for DSCR success](/mastering-the-brrrr-strategy-for-dscr-loan-success/).

## Construction loan guides (blog)

-   [Essential guide to construction loans](/blog/guide-construction-loans/)
-   [Innovative construction financing solutions](/blog/exploring-innovative-construction-financing-solutions/)
-   [Mid-construction refinance](/mid-construction-refinance/)
-   [New construction investment property guide](/blog/new-construction-investment-property-guide/)

## Ground-up FAQ

Can you get a ground up construction loan with no experience?

Select first-time builder files can be reviewed. Approval depends on the project, budget, contractor capabilities, liquidity, value support and exit. A strong general-contractor relationship does not by itself establish eligibility or maximum leverage.

What do lenders require instead of construction experience?

Prepare plans and specifications, a line-item budget, contractor bids and credentials, a draw schedule, land and title information, the cash contribution and reserve plan, and a supported sale or refinance exit. Confirm the actual lender’s requirements before committing to the project.

How much leverage is available on ground-up construction?

Up to 100% LTC on qualified fix-and-flip, new construction, luxury flip, and jumbo spec files up to $2.5M when deal economics support the risk — always sized to the lower of LTC and 75% of after-repair or as-completed value. Larger files have leverage quoted individually. Construction pricing is published at 8.99%–13.5% with a 12–18 months term on qualified files. Acquisition funding, work draws, fees, reserves and the permanent takeout are reviewed separately.

How do I apply for a new construction loan with Jaken Finance Group?

Submit plans, budget, timeline, and entity docs through the new construction application — or get approved online and pick your scenario.

Related guides: [new construction application](/newbuild/) · [get approved online](/scenario/)

## First-time ground-up — what replaces an experience track record

Sponsors without prior GC exits can still close when the file shows **licensed builder**, **fixed-price contract**, **detailed draw schedule**, and **conservative ARV/LTC**:

| Compensating factor | Underwriter weight |
| --- | --- |
| Licensed GC + bonded contract | High |
| 25%+ sponsor liquidity vs. budget | High |
| Feasibility study / soils report | Medium |
| Pre-sold or LOI from end buyer | High |

Qualified ground-up files price at **8.99%–13.5%** interest-only, with leverage **up to 100% of cost**, a **12–18 month** term, and a close in **10–14 business days**. Luxury and jumbo builds up to **$2.5 million** can use that cost cap and still stop at **75%** of as-completed value. The loan funds the lower figure. Compare [new construction application](/newbuild/) · [spec home build-to-rent](/spec-home-build-to-rent-financing-for-builders/) · [fix and flip for beginners](/fix-and-flip-loans-for-beginners/).

## Submit your ground-up build

Have plans, a GC, and a lot under contract? **[Apply for new construction financing](/newbuild/)** today — Jaken Finance Group reviews ground-up files nationwide.

## Draw schedule — first-time ground-up

| Draw | Release trigger |
| --- | --- |
| 1 | Foundation complete + inspection |
| 2 | Framing + roof dry-in |
| 3 | MEP rough |
| 4 | Drywall + trim |
| Final | CO or certificate of completion |

Never front-load more than **20%** before foundation inspection. **8.99%–13.5%** IO · [spec home BTR](/spec-home-build-to-rent-financing-for-builders/) · [newbuild hub](/newbuild/) · [draw process guide](/guides/fix-and-flip-draw-process/).

## What August 2026 starts and completions mean for a first build

National construction is still busy, and finished houses are arriving slower than they did a year earlier. The Census Bureau and HUD reported August 2026 housing starts at a seasonally adjusted annual rate of **1,275,000**. Single-family starts were **918,000**. Building permits ran at **1,394,000**, with **878,000** of those for one-unit homes. Completions were **1,128,000**, which is **27.1%** below the August 2025 rate of **1,548,000**. That completion drop was statistically significant in the release. The start-rate change versus a year earlier was not. Source: the [August 2026 New Residential Construction release](https://www.census.gov/construction/nrc/pdf/newresconst.pdf), published September 17, 2026.

Those figures matter more than a builder resume. A first-time sponsor is entering a market where permits are still being pulled, but houses are taking longer to reach a certificate of occupancy. Price the interest reserve off the completion trend, not off a best-case 9-month story.

Construction payrolls are large enough that a licensed general contractor is a hiring market, not a favor. The construction employment series stood at **8,364 thousand** in September 2026, up from **8,255 thousand** in September 2025. See [FRED series USCONS](https://fred.stlouisfed.org/series/USCONS). A bid from a contractor who is already booked through next spring is not a reason to skip the license check. It is a reason to ask which superintendent is actually assigned to your lot.

## Materials costs moved faster than house prices

The producer price index for construction materials reached **375.908** in August 2026. It was **341.458** in August 2025. That is a **10.1%** rise in twelve months. See [FRED series WPUSI012011](https://fred.stlouisfed.org/series/WPUSI012011). A fixed-price contract signed before that move is worth more than a verbal allowance.

**Example.** A vertical budget of **$380,000** set in August 2025, inflated by that 10.1% materials move, is about **$418,400** if the whole budget tracked the index. Real bids will not match the index line for line. Lumber, concrete, and electrical gear do not move together. The lesson is to rebid, not to paste 10% onto last year’s spreadsheet and call it done.

House prices did not rise that fast. The FHFA purchase-only index was up **2.6%** from July 2025 to July 2026. See the [September 29, 2026 FHFA HPI report](https://www.fhfa.gov/document/d/hpi/fhfa-hpi-monthly-september-2026). If your as-completed value rises 2% or 3% while hard costs rise about 10%, the spread shrinks. That is why underwriters want the lower of cost and as-completed value, not the story that “new homes always appraise.”

## Example: fund the lower of cost and as-completed value

This illustration is not a quote. It shows how Jaken Finance Group’s ground-up caps work together.

| Line | Amount |
| --- | --- |
| Lot under contract | $160,000 |
| Vertical hard cost, current bids | $380,000 |
| Soft costs, excluding interest | $45,000 |
| Contingency, 10% of hard cost | $38,000 |
| Interest reserve, described below | $55,000 |
| **All-in cost** | **$678,000** |
| As-completed value from comps | $920,000 |
| 75% of as-completed value | $690,000 |
| 100% of cost | $678,000 |
| **Loan, the lower figure** | **$678,000** |

The interest reserve assumes an average balance near **$500,000** at an example rate of **11%** for **12 months**. That is **$55,000**. Eleven percent sits inside the **8.99%–13.5%** band. Your file may price higher or lower.

If the appraisal instead supports **$850,000**, then 75% is **$637,500**. Cost is still **$678,000**. The loan drops to **$637,500**. The sponsor must bring about **$40,500** plus closing costs. A first-time builder who only modeled the $920,000 case will be short at the closing table.

Carry after the certificate of occupancy is separate. At 11% interest-only, **$637,500** costs about **$5,844** a month. Six months of unsold inventory is about **$35,000** before taxes, insurance, and utilities. Put that cash in the guarantor account, not in the draw budget.

## Permit, bid, and draw checklist for a sponsor without a build resume

Underwriters replace a track record with paper they can inspect. Collect these before you ask for a term sheet:

1.  Stamped plans and the zoning letter, or the recorded variance.
2.  A permit status note from the building department. “Applied” is not “issued.”
3.  A licensed general contractor bid with allowances named in dollars, not “TBD.”
4.  Proof of the contractor’s license, liability insurance, and workers’ compensation.
5.  A soils or compaction note if the lot was filled.
6.  A line-item budget that matches the bid, including the contingency and interest reserve above.
7.  Three as-completed sales of the same bed and bath count, closed inside a year, as close to the lot as the market allows.
8.  Entity documents and a bank statement that can cover the gap if value comes in low.
9.  A one-page exit: list and sell, or lease and refinance to a [DSCR loan](/dscr-loan-for-investment-property/). DSCR rentals close in about **14 business days** once that later file is complete. Do not use the construction clock for that refinance.

Draws should follow finished work. Foundation, dried-in frame, rough mechanicals, then finishes, then the certificate of occupancy. Do not ask the lender to fund cabinets before the roof is on. The [draw process guide](/guides/fix-and-flip-draw-process/) shows how inspection releases work on rehab files. Ground-up uses the same idea with a longer list of milestones.

## Where first-time files actually fail

Most declines are budget failures, not “you have never built.” These are the patterns that stall a file:

-   The lot contract expires before permits are issuable, and nobody priced an extension.
-   The bid excludes utility tap fees, impact fees, or a required sidewalk.
-   Two of three “comps” are renovations, not new houses, so the as-completed value is unsupported.
-   The sponsor’s liquidity is the same dollars as the down payment. There is nothing left for a change order.
-   The exit assumes a retail buyer with a conventional loan, but the floor plan misses a bedroom count that those buyers finance.

Jaken Finance Group reviews ground-up files in all 50 states. Send plans, the contractor contract, and the lot contract through the [new construction application](/newbuild/). If you are still choosing between a build and a rehab, start with [what kind of loan you need](/scenario/).

_Rates, terms and conditions offered only to qualified borrowers and are subject to change at any time without notice. Closing times are in business days and commence upon receipt of appraisal payment and satisfaction of borrower conditions. Closing times may be delayed due to appraiser property access. All loans are subject to full underwriting for loan approvals. Jaken Finance Group only finances non-owner occupied investment properties._

Review our [Privacy Policy](/jaken-finance-group-privacy-policy/) and [Terms of Service](/terms-of-service/).

Read our [investor loan FAQs](/faqs/).

**Jaken Finance Group, 2300 Barrington Road, Suite 400, Hoffman Estates, IL 60196**

## Related financing resources

Explore Jaken Finance Group programs and trusted reference material connected to this topic.

### On this site

-   [New construction loans for investors](/new-construction-loans-for-investors/)
-   [Multifamily construction loans (5–20 units)](/multifamily-construction-loans/)
-   [Small multifamily construction loans (5–9 units)](/small-multifamily-construction-loans/)
-   [Condo construction loans for investors](/condo-construction-loans/)

## Ready to fund your next deal?

Get pre-qualified in minutes. Speak with a lending specialist or submit your scenario online.

[Pre-Qualify Today](/scenario/) [Contact Us](/contact-jaken-finance-group-by-email/)

Or call [(833) 264-7776](tel:8332647776)