05 / Prepare the conversation

# Construction financing readiness and document checklist.

Organize the evidence, name the open questions, and turn a promising concept into a useful financing conversation.

[Open your checklist](#workbench) [Read the guide](#guide-content)9 minute guide · Interactive checklist

At a glance

Prepare a concise project summary, site and ownership information, current plans, construction scope and schedule, sources and uses, equity assumptions, draw timing and exit evidence. Label missing or unconfirmed items. The checklist organizes a financing conversation; completion does not certify accuracy, eligibility or approval.

In this guide

Put it into practice

## Your project preparation checklist

Check what you have prepared, then print this page for your project file.

0 of 9 items prepared

**Project summary**Use, unit count, stage, loan request and repayment plan.**Site and ownership**Address, purchase contract or ownership, existing liens and site-control dates.**Plans and approvals**Current drawings, zoning and permit status, utility and access questions.**Contractor and build schedule**Contractor proposal, relevant experience, milestones and expected completion.**Sources and uses**Line-item costs, evidence dates, contingency and financing allowances.**Equity and liquidity**Proposed cash contributions, land credit assumptions and funding timing.**Draw and interest plan**Monthly advances, payment timing, reserve allowance and delay case.**Exit evidence**Rent or sale assumptions, supporting market evidence and a stressed repayment case.**Open questions**Location coverage, guarantees, fees, releases, maturity and any extension provisions.

Selections are not uploaded or saved. Refreshing clears them.

## Prepare a concise project summary

Begin with a one-page description covering location, business purpose, planned use, unit count, development stage, budget, loan request, equity and intended repayment. Add the schedule you are working toward and the decisions still outstanding. Someone unfamiliar with the site should be able to understand what must happen next.

The checklist organizes preparation suggestions, not universal lender requirements. Mark an item only when you have reviewed the underlying material. A full checklist does not verify its accuracy or establish eligibility. Your selections remain in the current page and can be printed with the guide; refreshing the page clears them.

## Organize evidence around the decision

For the site, assemble the address, ownership or purchase agreement and the status of zoning, access and utilities. For the build, gather the latest plans, permit status, contractor proposal, line-item budget and schedule. For the sponsor, prepare an ownership chart, relevant project history and evidence of the proposed equity source. Keep sensitive personal and account documents for a secure channel designated by the recipient.

For repayment, bring the rental assumptions and comparable evidence or the unit-sales plan. Include your calculator scenarios with the assumptions clearly visible. Date each document so the reviewer can distinguish the current plan from an earlier version. A simple file index is often more useful than an unstructured folder of attachments.

## Questions to resolve before committing

Ask which costs and land contributions will be recognized, what is funded at closing, when equity must be contributed, and how draws are reviewed. Confirm the interest calculation, reserve treatment, fees, guarantees, insurance and maturity provisions. For unit sales, ask about partial releases. For a refinance, ask what evidence the future lender would require and when it can be produced. Record answers against the proposed documents rather than relying on a general description.

## A short glossary

**Commitment:** the total facility amount contemplated by the agreement. **Advance:** a funded portion of that facility. **Contingency:** a budget allowance for uncertain costs. **LTC:** loan divided by the specified project-cost denominator. **LTV:** loan divided by the specified property value. **NOI:** property operating income after operating expenses, before debt service. **DSCR:** NOI divided by annual debt service. **Takeout:** replacement financing used to repay existing debt. **Release payment:** the required payment associated with releasing specified collateral, as governed by the loan documents.

## Use a document index instead of an attachment pile

Organize the package so a reviewer can follow the same project through every file. Start with a document index showing the file name, purpose, date, owner and current status. Replace vague labels such as “final budget” with a clear version and date. Keep earlier versions available in your own records while identifying which one supports the current financing request.

The [NCUA construction and development guide](https://publishedguides.ncua.gov/examiner/Content/ExaminersGuide/Commercial%26MBL/CandD_Loans.htm) discusses feasibility and project monitoring in a credit-union context. It supports the value of organized evidence, but it does not establish the document requirements of this supplied financing scope. Ask which documents are needed for your actual transaction before sending sensitive materials.

| Preparation area | Useful information | Question it should help answer |
| --- | --- | --- |
| Project summary | Use, units, stage, amount, term and exit | What is the actual proposal today? |
| Site control | Ownership or purchase information and relevant dates | How is the site controlled, and what remains unresolved? |
| Plans and approvals | Current drawings and an accurate approval-status description | What work is planned and what must happen before it can proceed? |
| Construction | Contractor scope, exclusions, milestones and pricing dates | What will completion require in cost and time? |
| Sources and uses | Costs, proposed debt, contributions and land-credit assumptions | Do the funding sources reconcile with the uses? |
| Repayment | Rental or sales evidence, estimated costs and payoff assumptions | Could the intended exit retire construction debt? |

The index should expose missing information. An empty status cell is easy to overlook; “pending contractor revision” with a named follow-up owner is more useful. Avoid marking a document current simply because it is the newest attachment in an email chain.

## Worked preparation example: a six-unit rental proposal

Suppose a sponsor proposes a six-unit apartment building, requests $1.6 million and models an 18-month term. The project summary identifies the rental exit, current site status and the next construction milestone. Those facts give the reviewer a coherent starting point. They do not establish that the proposed loan or schedule is available.

The budget shows $2,175,000 of entered uses. A $1.6 million modeled loan leaves $575,000 of equity, with a hypothetical $250,000 of accepted land equity and $325,000 of remaining cash. The package should label the land credit unconfirmed until its actual treatment is resolved. Evidence of ownership is different from confirmation of accepted equity credit.

Next, attach the draw and interest scenario with its own assumptions. If it uses a different commitment from the budget, explain the discrepancy before presenting the files together. Carry the selected payoff into the rental exit model, then record what the income and takeout assumptions depend on. The useful result is a set of reconciled questions, rather than several unrelated calculator printouts.

A concise list might identify three next actions: obtain an updated contractor scope, confirm the proposed land credit and document the rental-income assumptions. Give each action an owner and a target date. This creates a practical path toward a review even when the project is still being developed.

## Distinguish readiness from certainty

Readiness means the project can be explained and the open issues can be identified. It does not require pretending that every estimate is final. A concept-stage budget can be useful when its limitations are stated. Problems arise when a preliminary allowance is presented as a fixed price, or an expected approval is described as already issued.

Use a consistent status vocabulary: available, under review, requested, unresolved or superseded. Add a short note where a missing item could change cost, timing or repayment. For example, a revised utility estimate may affect both the hard-cost budget and the expected start date. Keep that connection visible in the summary rather than burying it in a separate attachment.

The scope checker confirms only the entered category, business purpose, amount and term against the supplied boundaries. It cannot evaluate the contractor, sponsor, location, valuation or approval documents. Review the [project-type guide](/ground-up-construction/project-types/) if an apparent match is being treated as evidence of qualification.

## Check the package for contradictions

Read the project summary, budget, draw schedule and exit model side by side. Compare the unit count, loan amount, construction duration and repayment strategy. If one file assumes a rental building and another assumes individual condo sales, resolve the difference. If a revised budget changes the loan request, update the relevant schedule and explain the resulting contribution requirement.

Check amounts as well as labels. An interest allowance in project uses should not be added again as an entirely new cost when presenting an updated draw estimate. A payoff figure should identify whether fees or interest are included. Land equity should not also appear as cash ready to pay invoices unless a separate, documented funding source actually creates that cash.

Give the reviewer a short reconciliation note when assumptions differ intentionally. For example, a stressed exit case may use lower proceeds than the base case. Label it as a sensitivity test and preserve the original assumptions. The [budget guide](/ground-up-construction/budgets-equity/) and [exit guide](/ground-up-construction/planning-exit/) explain how those calculations connect.

## Keep sensitive information in the right channel

The checklist runs in your browser. It does not upload documents, save checked items or create an application. The calculators also process their assumptions locally. Printing or exporting a result creates a file you control; review that file before sharing it with anyone.

For a financing conversation, start with a clear project description and ask which secure channel should receive private supporting records. Do not place account details or identity documents into calculator fields or public links. Keep a record of what was shared and which version it supported. The [existing construction scenario form](/newbuild/) is a separate intake path, and calculator assumptions are not automatically transferred to it.

## Turn the checklist into a follow-up plan

Check an item after reviewing the supporting evidence, rather than after merely creating a folder. Print the guide and checklist when you need a dated working record. Refreshing clears the selections, so keep a separate task list for continuing work. If the plan changes, reassess the affected items instead of assuming that a previously complete checklist remains complete.

End the preparation process by identifying the next decision that matters most. It may be accepting a revised construction scope, confirming a funding source, or testing whether repayment remains plausible. Attach the unanswered questions to the current package. That makes a review easier to act on and gives the next conversation a clear purpose.

## Frequently asked questions

### Does matching the stated ranges mean approval?

No. The stated project types, unit counts, loan amounts and terms are only the supplied scope. They do not replace a transaction review. The guide does not provide a current rate sheet or a complete eligibility policy.

### Can the entire commitment pay contractors immediately?

Do not assume it can. Ask for the proposed closing advance, draw process and any holdbacks. Map invoice timing to expected funding so a reimbursement delay does not become an unexplained cash need.

### Is an extension part of the delay calculation?

No. The delay tool calculates additional interest and entered carrying costs. It does not grant an extension, model extension fees or establish that additional reserves will be funded.

### Does the checklist save or upload my documents?

No. Checked items remain only in the current page and clear when it refreshes. The checklist does not upload documents or submit an application. Print a working record if needed, and use a separately confirmed secure channel for private supporting records.

**Keep assumptions visible.**

Confirm project terms and support the figures you use before relying on a scenario.

[Prepare your project →](/ground-up-construction/readiness/)

Your preparation, in one place

## Return to the complete construction hub.

Revisit the assumptions, compare another scenario, and keep your project evidence current.

[Back to the hub](/ground-up-construction/) [← Previous: Plan the exit](/ground-up-construction/planning-exit/)

Updated November 2, 2026 · Published by Jaken Finance Group. General references are linked beside the relevant discussion; bank and credit-union guidance does not establish this product’s terms. Product parameters are from the supplied brief and have not been independently confirmed as a current offer.