# Mid-Sized Apartment Construction Loans

Size a mid-sized apartment construction loan using project cost, completed value and refinance proceeds. Work through a 40-unit budget and draw plan.

[Request Commercial Financing](/commercial-loan-request/) [Contact Us](/contact-jaken-finance-group-by-email/)

Updated November 2026

A lender can review an $8 million apartment construction request on a $12 million project by looking at eligible costs, completed value, the sponsor’s cash and the plan to repay the loan. In the 40-unit example below, those checks produce a **$7.8M modeled construction loan**, **$3M of cash equity** after land credit and an estimated **$730K gap at permanent refinance**. The figures are planning assumptions you can replace with your own.

## Apartment construction loan and equity calculator

See how much of the budget the loan can cover and how much cash equity remains after land credit.

### Estimated results

Modeled loan ceiling

$7,800,000

Total equity needed

$4,200,000

Cash equity after land credit

$3,000,000

Deal summary How the estimate adds up

-   Costs outside the lender’s eligible budget still need funding. Confirm the land credit and when your cash is due before assigning money to individual bills.

Borrowers

[Submit an apartment construction deal](/commercial-loan-request/?typeOf=Mid-sized+apartment+construction)

Brokers with a client deal

[Sign up as a broker](https://brokers.jakenfinancegroup.com)

[Size the construction loan](#how-much-can-you-borrow-to-build-40-apartments) · [Test the permanent refinance](#will-the-permanent-loan-repay-the-construction-balance) · [Prepare your request](#what-should-you-send-for-an-apartment-construction-review)

## How much can you borrow to build 40 apartments?

Start with separate figures for the development budget and the loan you want. The budget includes what it takes to acquire, build and carry the property. The loan request is the largest amount you want the lender to commit, including money held for draws. A lender may use a narrower list of costs and a different value assumption than the ones in your pro forma.

Here is an illustrative $12M budget for a 40-unit rental building. The sponsor already owns the site. The land shown in the budget is also shown as equity once the lender has agreed to recognize it.

| Project use | Illustrative amount |
| --- | --- |
| Land already owned | $1.2M |
| Hard construction costs | $7.8M |
| Design, permits and other soft costs | $1.4M |
| Construction contingency | $600K |
| Financing costs and reserves | $1M |
| **Total development budget** | **$12M** |

Suppose the prospective lender accepts all these costs and models a limit of 70% loan-to-cost, or **$8.4M**. The same lender models a cap of 60% of the building’s **$13M as-completed value**, or **$7.8M**. The lower figure controls in this example. The loan falls $200K below the requested $8M. Availability, eligibility and actual limits are deal-specific.

When a proposal has several limits, put dollar amounts next to each one. If someone quotes a percentage of cost, ask for the cost basis. If someone quotes a percentage of value, ask which valuation they use and what state the building must reach to support it. The construction appraisal may consider the completed property, while an exit lender may base its valuation on income after leasing. Ask about additional constraints tied to sponsor funds, project stage or repayment. You can use the [commercial construction lender comparison](/commercial-construction-loan-lenders/) to decide which desks are worth approaching.

## How much equity is land, and how much must be cash?

At a $7.8M loan commitment, the difference between the loan and the $12M budget is **$4.2M**. If the lender credits $1.2M of land equity on the site you own free and clear, the remaining contribution is **$3M in cash**. That is the total modeled cash to put into the job. The draws and equity schedule determine the dates on which it is needed.

If the land has an existing loan, get the payoff and show how it will be paid. Ask the construction lender how it calculates your land credit. Some credit already incurred costs differently from land value, and a lien can reduce the equity available. Give the lender the deed, original purchase and closing records, a current payoff if applicable, and support for any value you propose. Ask it to confirm the accepted contribution and whether that change also affects eligible costs. [Using mortgaged land as equity](/construction-loan-land-equity-existing-mortgage/)

Two quick tests tell the team where to focus. If the accepted land credit drops to $900K and the budget and loan amount stay fixed for the test, required cash rises to **$3.3M**. If the completed value drops to $12M with the 60% cap still in place, the loan falls to **$7.2M**. With the original land credit, the sponsor now needs **$3.6M in cash**. Run those changes separately before combining them. You can rerun your own assumptions with the [construction budget and equity calculator](/ground-up-construction/budgets-equity/).

Check the cash source with the same care as the amount. Identify what is in the borrowing entity, what a partner has already committed and what still depends on another closing. If surplus cash sits in a different project, check when it can be transferred and which approvals it needs. The lender will want to see when funds become available, especially when the first invoice comes due.

If the appraisal leaves a shortfall, see [how equity, mezzanine debt and C-PACE affect funding and the refinance](/construction-loan-gap-after-appraisal/).

## What happens if the construction price changes?

Read the exclusions in the contractor’s bid alongside the plans. A price may leave out utility connection fees, winter work or a fixture that has yet to be selected. An allowance sets aside a number for an item that can still change. Mark each allowance, get a date for a firm price and ask who pays the difference if it comes in high.

Take the $12M project. Suppose a revised bid adds $250K of work above the original contingency. The new budget is $12.25M. Even if the lender accepts the added work as an eligible cost, the 60% cap on the same $13M completed value still limits the loan to $7.8M. With the same $1.2M land credit, sponsor cash rises to $3.25M. Review that increase before signing a change order or giving up a purchase contingency.

Track each change in the budget and schedule together. If the added work pushes the finish date, check whether you need more money for interest and insurance as well. A dated change log gives you a way to show the lender what moved and who has committed to pay.

## Can you cover the time between invoices and draws?

Convert the budget into a calendar that shows when funds come in and bills are due. Ask which cash the sponsor must fund at closing and whether later equity is due up front, by milestone or alongside loan advances. A $3M cash contribution and a $7.8M loan can balance on paper while the contractor waits to be paid.

Suppose $1M of the cash is due at closing and the other $2M is scheduled across the build under the modeled draw plan. During the first funded month, a supplier and contractor need **$450K** before the next draw. After reserving money for other bills, you have **$300K** free until the inspector signs off. The project has a **$150K timing gap**. The invoice is already in the budget. The decision is how to pay it on time, such as by rearranging payment terms, supplying short-term liquidity or agreeing on a lender-permitted direct vendor payment.

Ask to walk a single payment through the lender’s process. Find out when the borrower presents the draw, when the inspector can visit, what invoices and waivers are needed, and how retainage is handled. Retainage is money held back until agreed work or closeout items are complete. Keep track of when it is due to each trade and how it will be funded. If an inspection is delayed or a bid excludes a long-lead item, update your calendar before promising a vendor a payment date. [OCC commercial real estate lending handbook](https://www.occ.gov/publications-and-resources/publications/comptrollers-handbook/files/commercial-real-estate-lending/index-commercial-real-estate-lending.html)

Model interest from the dates you expect advances. Ask the lender what costs its reserve can fund and when you would need to add cash. A slower build can make you carry an outstanding balance longer. A faster build can bring forward a run of large trades. The [construction draw and interest calculator](/ground-up-construction/draws-interest/) lets you put those timing differences into dollars.

## What can delay the first construction advance?

Put the purchase agreement and approval schedule next to the construction timeline. You may be able to close a loan while a permit is pending, but a lender could hold later funds until specified approvals are in place. Get the conditions for closing and the first build draw in writing. Ask who can confirm water and sewer service, power, fire access and any off-site work the city requires.

On a site under contract with permits pending, show the date your deposit becomes nonrefundable and the date the seller expects payment. If you would have to buy the site and hold it first, price the cash it takes to carry it. Include interest, taxes, site work and the costs of another closing. Show how the plan changes if the site takes longer to reach the point where a lender can fund construction. [Buying the site before permits](/land-acquisition-before-construction-permits/)

If the site has more than one phase, submit a phase plan and a full-site plan. Give the first phase its own budget, dates and exit assumptions. Document which building can be occupied on its own and which parts rely on common work. For example, the contractor may need to finish a shared utility line and access drive before delivering one building. Make the costs and responsible parties visible early. Start with the [construction readiness checklist](/ground-up-construction/readiness/) while the approvals and bids are taking shape.

For two apartment buildings that share site work, [run the budget and exit for the first building on its own](/phase-one-construction-financing/).

## Will the permanent loan repay the construction balance?

A construction loan can cover the build and still leave a gap at refinance. Estimate the permanent loan from both property value and the income available for debt payments. Compare the smaller estimate, after fees, with the amount you expect to owe at the exit.

Return to the same 40-unit project. Assume average monthly rent of $2,400 at stabilization. That is **$1,152,000 per year** at full scheduled rent. Model $57,600 in vacancy and concessions, or 5% of scheduled rent, and $374,400 in annual operating expenses. That leaves **$720K in net operating income**, the property income left after operating expenses and before debt service.

| Permanent loan test | Modeled result |
| --- | --- |
| Value using a 6% capitalization rate | $720K divided by 6% gives **$12M** |
| Value-based loan at 65% loan-to-value | $12M × 65% gives **$7.8M** |
| Cash flow at 1.25× debt-service coverage | $720K divided by 1.25 gives **$576K a year** available for modeled debt service |
| Loan supported by $576K of annual payments | About **$7.215M** at an assumed 7% rate, amortized over 30 years with monthly payments |
| Net proceeds after assumed 2% costs | About **$7.070M** |
| Cash needed against a fully drawn $7.8M payoff | About **$730K** |

Debt-service coverage ratio, or **DSCR**, compares net operating income with scheduled loan payments. The $7.8M value-based amount appears to cover payoff. In this case the debt-service test lowers the actual modeled proceeds, and closing costs lower the cash available again. Check whether the projected payoff includes any unpaid interest, fees or required reserves separately from the principal balance used in the example.

Use different values for different decisions when the evidence supports it. Here the initial construction model uses a $13M completed-value assumption. The permanent loan test produces a $12M value from a new set of income and capitalization assumptions. Ask both lenders which value their credit decision uses. Record the assumptions behind each number so your team can update them after the bids or rent evidence change.

## What if rents or collections come in below plan?

Run a downside case before you rely on refinance proceeds. If annual net operating income comes in at **$660K**, the same 1.25× coverage and assumed repayment terms support about **$6.614M** of debt. At a 6% cap rate and 65% loan-to-value, the modeled value limit is $7.15M. The lower debt-service limit still controls. After 2% in costs, the cash gap to a $7.8M payoff grows to about **$1.32M**.

Ask your leasing team for rents after concessions, how quickly comparable buildings are filling and when tenants are likely to pay. Add steps for certificates of occupancy and staggered move-ins to the financing calendar. Figure out what would have to change if permanent proceeds came in short. Common questions involve taking a smaller construction commitment, reserving additional cash for the payoff or allowing more time to establish collections.

Permanent lenders can have different occupancy and operating requirements. Fannie Mae publishes a near-stabilization execution for eligible projects with specific conditions. Check the current term sheet and the lender’s transaction requirements before relying on early permanent funding. You can run both income cases through the [construction exit calculator](/ground-up-construction/planning-exit/). [Fannie Mae near-stabilization term sheet](https://multifamily.fanniemae.com/financing-options/conventional-properties/near-stabilization-financing/near-stabilization-execution-term-sheet)

## What should you send for an apartment construction review?

Start with a summary a lender can compare with the actual file. Say what you are building, what it costs, how much you want to borrow and when work should start. Then put together these items as they become available.

-   **Site and permits.** Address, purchase agreement or deed, approvals in hand, dates for what is still pending and the person responsible.
-   **Budget and contract.** Dated construction bid, owner-paid costs, contingencies, allowances, schedule and cash flow by month.
-   **Team and cash.** Similar jobs completed, who led them, the proposed guarantors and how much equity is already committed.
-   **Lease-up and exit.** Unit mix, supported rents, expected concessions, operating budget and modeled net refinance or sale proceeds.

If this is your first apartment build, be precise about what your team has already done. Your contractor’s experience can help, and a lender may also want to see who has run a project of similar size from approvals through leasing. Give each principal’s role on one comparable job, their role here and how decisions and overruns will be handled. If a partner is joining for their experience or cash, disclose the planned ownership and funding commitments. [First-time apartment developer checklist](/first-time-apartment-construction-loans/)

Use the [commercial financing request](/commercial-loan-request/) for an initial review. Include the **requested loan amount** and the **total development budget** as separate figures, along with the closing deadline. If your apartment loan request is **$10M or more**, use the [focused multifamily review](/large-multifamily-deal-review/). Brokers can submit a client’s plan through the [broker portal](https://brokers.jakenfinancegroup.com/).

If you already broke ground and the original facility can no longer fund the project, use the [mid-construction refinance guide and worksheet](/mid-construction-refinance/). For completed apartments with a maturity approaching, see [apartment lease-up refinance](/apartment-lease-up-refinance/) to compare extension, bridge and early permanent financing with the actual payoff.

## Related financing resources

Explore Jaken Finance Group programs and trusted reference material connected to this topic.

### On this site

-   [Ground up construction loans no experience](/ground-up-construction-loans-no-experience/)
-   [New construction loans for investors](/new-construction-loans-for-investors/)
-   [Multifamily construction loans (5–20 units)](/multifamily-construction-loans/)
-   [Small multifamily construction loans (5–9 units)](/small-multifamily-construction-loans/)

## Frequently asked questions

Can I request $8 million for an apartment project with a $12 million budget?

Yes, you can request a review for that loan amount. The lender will assess eligible costs, completed value, the sponsor's cash and experience, and expected repayment. In the worked example, the completed-value limit reduces an $8 million request to a modeled $7.8 million commitment.

How much equity do I need for a mid-sized apartment construction loan?

Start with total development cost less the modeled loan commitment. Then deduct land equity and prior costs that the lender agrees to credit. Confirm when the remaining cash is due and how you will cover bills that come before draw reimbursement.

Can I get apartment construction financing as a first-time developer?

A lender may review a first-time sponsor with a team that has completed comparable buildings. Show each team member's role, track record, cash contribution and ability to sign required guarantees. Ask the lender what experience it requires from the sponsor as well as the contractor.

When should I arrange the permanent apartment loan?

Test the expected permanent loan before signing construction terms. Check the occupancy, rent collection and operating records an exit lender will need. Compare net proceeds after expenses with the projected payoff, then update the estimate as completion and move-ins approach.

Where can I request a review of a mid-sized apartment development?

Use the commercial financing request. Include the site, unit count, development budget, requested commitment, approvals, sponsor and contractor, timeline, equity and exit plan. The focused large multifamily form accepts apartment requests of $10 million or more for review.

## Ready to fund your next deal?

Get pre-qualified in minutes. Speak with a lending specialist or submit your scenario online.

[Request Commercial Financing](/commercial-loan-request/) [Contact Us](/contact-jaken-finance-group-by-email/)

Or call [(833) 264-7776](tel:8332647776)