# Refinancing Apartments Before Retail Build-Out Is Complete

See how to refinance completed apartments while retail is under construction. Model payoff proceeds, a retail work reserve and the cash needed at closing.

[Request a Mixed-Use Refinance Review](/commercial-loan-request/) [Contact Us](/contact-jaken-finance-group-by-email/)

Updated November 2026

**You may be able to refinance completed apartments while the ground-floor retail build-out is still underway.** The new lender will need to verify which apartments can be occupied, how the retail space will be finished and whether enough cash is available to pay off the construction loan after fees and any retail reserve.

## Mixed-use payoff and retail reserve calculator

See how much of the new loan goes to the payoff and how much cash you still need for closing and retail work.

### Estimated results

Loan proceeds available for payoff

$8,470,000

Cash needed for payoff at closing

$930,000

Retail costs outside the holdback

$150,000

Total gap after available cash

$480,000

Deal summary How the estimate adds up

-   Confirm when your cash and reserve draws can fund. If loan proceeds exceed the payoff, count that excess as available cash only if the lender releases it for the work.

Borrowers

[Submit a mixed-use refinance](/commercial-loan-request/?typeOf=Mixed-use+refinance+with+retail+build-out+remaining)

Brokers with a client deal

[Sign up as a broker](https://brokers.jakenfinancegroup.com)

[Compare refinance paths](#which-lenders-can-refinance-before-retail-build-out-is-done) · [Run a $9M refinance example](#worked-example-with-a-9m-refinance-and-a-retail-reserve) · [Prepare your payoff package](#what-should-you-send-for-a-mixed-use-refinance-review)

## Which lenders can refinance before retail build-out is done?

Start with the current loan maturity and when the retail space can reasonably be delivered. A mixed-use bridge lender may consider a whole-property refinance during apartment lease-up and reserve part of the new loan for the storefront. A portfolio bank may also review a near-complete property it can lend on and monitor. In either case, ask whether the lender can close on the exact condition of the building today and what it needs before then.

| Refinance path | What should be clear before you count on it |
| --- | --- |
| Bridge debt on the whole property | The lender can accept the remaining work, has agreed to the scope and budget, and will release enough at closing to clear the old loan with your cash |
| A separate loan on the apartments | The apartments can secure a separate lien, the old lender will release them, and the new lender accepts the agreements for shared systems and access |
| An extension from the current lender | You can meet the extension conditions, fund any retail bills or carry that come due, and reach the next refinance milestone in time |
| A near-stabilization or permanent loan | The program accepts your actual occupancy, construction status and collateral. Ask which retail conditions must be met before closing |

Fannie Mae’s near-stabilization materials describe a path for eligible multifamily properties after reaching construction and occupancy milestones. A borrower with open retail work should ask the lender how that work affects program eligibility and what it considers complete. Share the retail scope and list of open permits with the lender before it schedules an appraisal. [Fannie Mae near-stabilization financing](https://multifamily.fanniemae.com/financing-options/conventional-properties/near-stabilization-financing)

Berkadia reported a **$103M construction takeout in September 2024** for The Gardens Residences, a 358-unit North Miami apartment property with ground-floor retail. Berkadia said the loan closed as the project approached its first temporary certificate of occupancy and construction neared completion. [Berkadia’s reported construction takeout](https://www.berkadia.com/news/the-gardens-residences-miami-fl-financed-by-berkadia-2024/)

## What does apartment completion mean for the loan?

Collect the building department’s occupancy documents and show which units or areas each one covers. A temporary certificate can have conditions or an expiration. A permit that allows retail work can have a separate schedule. Ask the building team whether any remaining work will affect occupied units, exits, common areas or essential services. As one local example, Chicago describes when a certificate of occupancy is required for a building or change of use. Check the process for your property’s location. [City of Chicago certificate of occupancy guidance](https://chicago.gov/city/en/depts/bldgs/supp_info/certificate-of-occupancy.html)

| What the lender needs to understand | What you can send |
| --- | --- |
| Which apartments can legally be occupied | Certificates, expiration dates, areas covered and a list of open conditions |
| How much residential income is coming in | A dated rent roll with signed, occupied and paying units identified, plus collections, concessions and recent expenses |
| What still has to happen downstairs | The shell or build-out scope, dated costs, who owes each amount and the inspection and delivery schedule |
| Which work may affect residents | Any shared fire, water, power, entry or loading work, with the contractor’s plan for access and outages |
| Who pays if completion takes longer | The proposed reserve schedule, sponsor funds, any tenant reimbursement and dates when the cash can be used |

Give the lender the rent commencement terms if there is a signed retail lease. Pair the promised delivery condition with the work and cash needed to get there. Identify any free rent or conditions that delay collections after delivery. If the storefront is vacant, ask the lender what rent and expenses it uses in its analysis today and what changes if a tenant signs before closing. This can affect sizing as well as the required cash reserve. [Fannie Mae commercial lease underwriting guidance](https://mfguide.fanniemae.com/node/6186)

### Can you refinance just the apartment portion?

Have title and counsel look at what the current mortgage covers and what collateral a new lender could take. Two entrances alone leave the loan question open. One mortgage may cover the whole property, including both uses and the systems they share. If there is already a separate parcel or condo unit, send the recorded documents and the agreements for access, utilities, insurance and upkeep.

Ask the current lender what it would take to release the apartment collateral and for a written release price. The payment may differ from the share of balance you assigned to the apartments in your budget. If the retail space will still owe money on the first loan, the banks must review how the two loans and the shared property rights work together. Model that release and separate loan only once the needed parties confirm the structure.

## Worked example with a $9M refinance and a retail reserve

A **48-unit apartment building** can legally house residents. The ground-floor storefront still needs work. The old construction facility has a **$9.4M** payoff. Assume a new lender offers **$9M gross at closing** before **$180K in deducted closing costs** and a **$350K holdback**. A holdback is part of the loan that the lender keeps for a defined purpose, here to pay approved retail work as it is done. These amounts are for the example.

| Closing and remaining work | Amount |
| --- | --- |
| Gross refinance advance | **$9M** |
| Net refinance proceeds available for payoff | $9M − $180K fees − $350K holdback = **$8.47M** |
| Sponsor cash needed for the old loan at closing | $9.4M − $8.47M = **$930K** |
| Remaining retail budget, including contingency | **$500K** |
| Retail work outside the holdback | $500K − $350K = **$150K** |
| Total sponsor cash for the payoff and remaining work | $930K + $150K = **$1.08M** |

The sponsor has **$600K** ready. Even if all of it goes to the payoff, there is a **$330K shortfall on closing day** and another **$150K** to find for retail. The calculator shows a **$480K total gap after the available cash**. Make a funding plan by date. A contribution that arrives weeks after the old loan is due will only help on closing day if there is a way to advance it or move the payoff date.

You can check the budget as one set of sources and uses. The $9.4M payoff, $180K fees and $500K of work equal **$10.08M** of uses. The $9M loan plus $1.08M of sponsor cash equals $10.08M. The holdback is part of the $9M loan and covers part of the $500K retail work. Use the closing statement and the draw schedule together so that each dollar appears once.

### What if the lender reduces the proceeds to $8.6M?

Leave the fee and reserve assumptions in place. Lower the gross advance to **$8.6M** in the calculator. Proceeds for the old lender drop to **$8.07M**, so cash needed at closing rises to **$1.33M**. The $150K for retail remains. Total sponsor cash rises to **$1.48M**, leaving an **$880K gap** after the same $600K of confirmed cash. Ask when the loan size and reserve will be set. If either can still move, have a plan for the revised numbers before you count on a closing.

## How do retail reserve draws work after closing?

A reserve can cover a cost and still leave you with a cash timing problem. Ask if the lender can pay contractors directly or reimburses the borrower after payment. Get the invoice cutoffs, inspection timing and how often draws are released. Confirm which items the lender will pay for and what is required, such as lien waivers, approved change orders or proof of completed work. Ask what happens to money left in reserve once the work is accepted. [Construction draws and interest guide](/ground-up-construction/draws-interest/)

In the example, suppose a contractor’s **$220K** bill includes **$170K** of approved reserve costs. If payment is due before the first reimbursement, the sponsor needs $220K available for that bill. The **$50K** in costs outside the reserve is part of its $150K sponsor budget for work. The **$170K** it must advance until reimbursement is an additional cash timing need. Put the bill due date and reimbursement date side by side on your cash schedule.

Confirm how interest accrues. Ask whether the lender funds the reserve on day one or advances it over time, and what balance bears interest. Then check the date remaining advances expire and what it takes to extend that date. A retail delay can affect income and keep money in the reserve longer, even as the apartment portion is leasing up.

### What if the retail budget rises after you get a quote?

Suppose the contractor finds **$90K of added ventilation work** and the remaining retail budget rises to **$590K**. If the loan and reserve stay the same, the closing cash need remains $930K and the sponsor’s share of the work rises to $240K. After applying the same $600K of available cash, the modeled gap is now **$570K**.

If the lender moves $90K of the same loan into the reserve, the holdback grows to **$440K**. Only $8.38M is now available to pay the old lender. The sponsor needs **$1.02M at closing** and $150K for work. The total gap stays at $570K and more cash is due at closing. Ask whether an increase in a reserve comes from a larger loan or from the dollars set aside for payoff. Try both the $590K budget and the $440K holdback in the calculator to see the difference in timing.

### Which landlord costs can you document before the retailer moves in?

Use the signed work letter or delivery agreement to list each party’s duties. A promised tenant allowance can come due after the tenant provides proof of spending. Work on ventilation, electrical service or plumbing may need funding before the tenant can start its part. Have the contractor match those amounts to invoices or bids and identify the earliest due date for each. Keep a separate line for owner obligations that apply even if the tenant leaves.

If the tenant is expected to reimburse an expense, ask the lender what evidence it needs to count that cash. Build the sponsor’s cash schedule around the dated payment and draw terms. A tenant’s share of future expenses may ease the overall budget while the owner still has to pay a contractor before either reimbursement arrives.

## What if you can get more time on the current construction loan?

Ask the existing lender for a dated payoff and any written extension terms while you check the takeout. Find out whether the lender will keep paying approved retail bills during the added time and what conditions can pause draws. An extension fee is one cash cost. Add monthly loan interest, carry and the money you need for work during the extension, then subtract supportable property cash flow.

Use that cash cost to compare the milestones you can reach. An extra quarter might let you satisfy occupancy conditions, hand over the storefront or show new collections. If a utility approval or an inspection is the timing risk, ask who controls the next date. Where the remaining work affects apartments or removes their ability to open, use the [mid-construction refinance guide](/mid-construction-refinance/) to build a cost-to-complete budget first. Where both uses are finished and the apartments are still filling, compare [lease-up refinance options](/apartment-lease-up-refinance/).

## What should you send for a mixed-use refinance review?

Start with the request in one line. Include the amount due on the old loan, the payoff deadline, the number of apartments open and the dollars left to finish retail. Then attach the facts a lender can verify.

1.  **Show the payoff and any time you can buy.** Include maturity, extension deadlines, penalties or fees, and the latest payoff with its good-through date. Flag any old construction funds the current lender still controls.
2.  **Show the apartments are ready to operate.** Send occupancy documents, a current rent roll, actual income and costs, and any open conditions. Show occupied and rent-paying units separately.
3.  **Show the retail work and who pays.** Send the remaining cost schedule and bids, permits and delivery dates. Include the lease and work letter if signed. Mark what the landlord, contractor or tenant is responsible for.
4.  **Show the funding by date.** Send the gross advance, fees, proposed holdback and the amount left to pay off the old loan. List how much sponsor money is available at closing and what cash remains for the contractor before reimbursements.
5.  **Show the collateral if you want a separate loan.** Include the title material, parcel or condo documents, shared service agreements and any release terms from the incumbent lender.

[Submit your mixed-use refinance request](/commercial-loan-request/?typeOf=Mixed-use+refinance+with+retail+build-out+remaining) with the calculator summary and the dates of the next payoff or draw. If you are still planning the project and want to avoid this cash squeeze, use the [mixed-use construction guide](/mixed-use-construction-loans/) to test the retail budget before you set the original loan amount.

## Related financing resources

Explore Jaken Finance Group programs and trusted reference material connected to this topic.

### On this site

-   [Commercial real estate financing](/commercial-real-estate-financing/)
-   [Multifamily DSCR vs commercial loan (no unit maximum)](/blog/multifamily-dscr-vs-commercial-loan/)
-   [Mixed-use vs multifamily financing](/blog/mixed-use-vs-multifamily-financing/)
-   [Commercial bridge loan vs SBA loan](/blog/commercial-bridge-loan-vs-sba-loan/)

## Frequently asked questions

Can I refinance my apartments while the ground-floor retail build-out is still underway?

Possibly. A mixed-use bridge lender may refinance the property if it can verify legal apartment occupancy, the retail work can be completed safely, and the payoff and remaining costs have committed funding. Confirm what the lender will actually release at closing.

Does an apartment certificate of occupancy cover unfinished retail?

Check the certificate and its conditions with the local building authority. Confirm which units or areas it covers, when it expires if temporary, and whether work on shared systems could affect how the apartments can be occupied.

Can I refinance just the apartments on a mixed-use property?

A separate apartment loan may be possible if the lender can take enforceable collateral on that part and the existing lender agrees to release it. Ask title, counsel and both lenders to confirm the legal structure, shared property rights and required release payment.

How does a retail holdback affect a construction loan payoff?

When the new lender keeps a portion of loan proceeds in a reserve for retail work, those dollars may be released later on approved draws. Subtract the holdback and deducted fees from the gross closing advance to see how much of the new loan is available for the existing payoff.

What if the new loan is too small to pay off construction debt and finish retail?

Calculate the payoff shortfall and unfunded retail work separately. Ask about additional equity and when it can fund, terms for an extension, or a lender that can change the structure. Get the revised payoff and release terms in writing before relying on them.

## Ready to fund your next deal?

Get pre-qualified in minutes. Speak with a lending specialist or submit your scenario online.

[Request a Mixed-Use Refinance Review](/commercial-loan-request/) [Contact Us](/contact-jaken-finance-group-by-email/)

Or call [(833) 264-7776](tel:8332647776)