> Source: https://jakenfinancegroup.com/new-construction-loans-chicago/

More than $535 million in real estate loans.

Chicago · Illinois

# New Construction Loans Chicago

Chicago new construction loans for teardown three-flats, coach-house ADUs, and infill. 8.99%–13.5% interest-only with draws tied to DOB inspections.

[Get Construction Terms](/newbuild/?source_page=new-construction-loans-chicago&property_area=Chicago) [Call (833) 264-7776](tel:8332647776)

![Chicago skyline and Lake Michigan — DSCR and hard money lending market](/_astro/hero-skyline.BiMOlrep_1jkKmC.webp)

Chicago skyline — Jaken Finance Group

Chicago is not a sprawl market. **New construction** here means an infill lot in Bridgeport, a teardown three-flat in West Ridge, or a coach house where [zoning allows](/adu-zoning-basics-chicago-edition/). It does not mean a greenfield street with eight new lots. If you still do not know whether you need a spec loan, a land bridge, or a small-plat facility, start at [new construction loans for investors](/new-construction-loans-for-investors/).

Use this Chicago page to pick the product. Permit-fee tables, FAR math, and GC license classes live on [spec home construction loans Illinois](/spec-home-construction-loans-illinois/). Collar plats and builder takedowns live on [Will, Kane, and McHenry small-plat financing](/will-kane-mchenry-small-plat-financing-guide/). Luxury Naperville specs have their own page.

Jaken Finance Group prices qualified construction files at **8.99%–13.5%** interest-only. Draws follow [Chicago Department of Buildings](https://www.chicago.gov/city/en/depts/bldgs/provdrs/permits.html) inspections. Close targets **10–14 business days** when the package is complete.

## Pick the Chicago construction path

| What you actually have | Facility | Next page |
| --- | --- | --- |
| Teardown or vacant infill, 2–4 units, city lot | Construction with DOB draws | Stay here, then [Illinois spec](/spec-home-construction-loans-illinois/) |
| Rear coach house or basement ADU | Construction or a smaller second | [ADU zoning](/adu-zoning-basics-chicago-edition/) · [coach-house financing](/chicago-coach-house-adu-financing-guide/) |
| North-side or inner-collar teardown economics | Dual-exit teardown model | [Infill teardown economics](/blog/chicago-infill-teardown-rebuild-economics-2026/) |
| Naperville or Hinsdale custom spec | Luxury vertical | [Luxury new construction Naperville](/luxury-new-construction-loans-naperville-il/) |
| Four to twenty lots in Will, Kane, or McHenry | Land, plat, streets, takedowns | [Collar small-plat guide](/will-kane-mchenry-small-plat-financing-guide/) |
| Unplatted acreage with no recorded lots | Land bridge, not a house loan | [Vacant land loans](/vacant-land-loans-raw-land-financing-investors/) · [subdivision financing](/subdivision-development-financing/) |

If two rows both feel true, pick the **earlier** phase. We can sequence later. We cannot treat a Will County sketch plat as a Chicago three-flat.

## What gets built (and funded) in 2026

Teardown to three-flat is the common city file where land value exceeds rehab economics on existing brick. Two-flat plus rear ADU shows up where Affordable Requirements Ordinance rules and ADU pathways intersect. Confirm zoning before you option the lot. Single-family custom is less common inside city limits. Collar counties see more horizontal product. That horizontal product is not this page.

## Construction loan structure

| Item | Range |
| --- | --- |
| Rate | **8.99%–13.5%** interest-only during build |
| LTC | Up to **100%** on qualified files (land + vertical) |
| As-completed cap | We fund the **lower** of LTC and **75%** LTARV |
| Term | 12–18 months + extension options |
| Draws | Foundation, framing, MEP rough, drywall, CO |
| GC requirement | Licensed, insured, resume of Chicago work |
| Close | **10–14 business days** with complete diligence |
| DSCR takeout | **5.75%–10.5%** at 1.0+ DSCR, **70%–75%** LTV |

## Permits and politics — budget real time

Chicago Department of Buildings inspections can add **4–8 weeks** to a naive timeline. Funded draws align to foundation sign-off, structural and framing, rough mechanicals, drywall and finish, then certificate of occupancy. Investors who treat Chicago like a Texas subdivision schedule get crushed on carry. For fee calculators, Self-Certification, and GC class tables, use the [Illinois spec construction guide](/spec-home-construction-loans-illinois/).

## Worked scenario: South Shore infill duplex

Lot acquisition **$95,000** plus vertical **$285,000** for a modern **two-unit** (each 1,100 sf). Soft costs and interest reserve add about **$48,000**. Total project cost is about **$428,000**. One unit presold at **$310,000** prior to CO.

As-completed value on the pair is about **$575,000**. Seventy-five percent of that is **$431,000**. One hundred percent of cost is **$428,000**. We fund the **lower** number. On this file LTC and LTARV almost tie, so the advance can sit near **$428,000** on a qualified borrower. Interest at **11.5%** IO on an average drawn balance near **$280,000** for **11 months** is about **$29,500**. Exit is a unit sale plus [DSCR on the retained unit](/dscr-loans-chicago/) at **70%–75%** LTV, not 85%.

If the second unit does not lease, the DSCR takeout shrinks. Pre-lease or presale is not a marketing preference. It is how the construction balance gets paid down at CO.

## Chicago zoning realities for builders

Confirm **RS-3 / RT-4** before you close. Those districts are common for two-flat and three-flat entitlements. Affordable Requirements Ordinance may apply on larger developments. Legal review is required. Rear coach houses and basement units have expanded pathways in select wards. See the [ADU guide](/adu-zoning-basics-chicago-edition/). Orange-rated structures can trigger a 90-day demolition delay. Budget that carry. Unlike [collar-county plats](/will-kane-mchenry-small-plat-financing-guide/), Chicago vertical construction also faces aldermanic scrutiny. Community meetings add calendar risk.

## Two-flat teardown economics (2026)

When land exceeds rehab value, teardown-rebuild wins.

| Item | Example (Northwest side) |
| --- | --- |
| Land / teardown | $180,000 |
| Vertical (new 3-flat) | $520,000 |
| Total | $700,000 |
| Stabilized value | $950,000–$1.05M |
| Per-door rent (new) | $1,800–$2,100 |

Construction loan at **100% LTC** on qualified files keeps equity demand down. Presale or pre-lease one unit before CO to satisfy the exit lender. Dual-exit math for north-side teardowns is unpacked in the [2026 infill teardown article](/blog/chicago-infill-teardown-rebuild-economics-2026/).

## Winter build schedule — non-negotiable in Chicago

Concrete pours below **40°F** need blankets and additives. Roofing slows in November. Pour foundations by **mid-October** or wait until April. Order long-lead mechanicals in the framing phase. Build a **2-month weather contingency** into the interest reserve.

## Why Jaken Finance Group for Chicago construction

We are headquartered in **Hoffman Estates** with Chicago metro deal flow daily. Draw inspectors understand the **Chicago DOB sign-off sequence**. They do not use a generic national checklist.

## Comparison: Chicago infill vs. Will County horizontal

|  | Chicago infill 3-flat | [Will / Kane / McHenry plat](/will-kane-mchenry-small-plat-financing-guide/) |
| --- | --- | --- |
| Permits | DOB, slower | Municipal plat plus building dept, faster vertical |
| Product | Vertical rental | SFR lots, then houses or builder takedowns |
| RLTO | Yes if Chicago | No |
| Front-loaded fees | Formula permit, no land-cash | Impact, land-cash, and road fees per lot |
| Exit | DSCR per door | Lot sale, spec sale, or DSCR on new SFR |

Many investors **build new in Will or Joliet** and **rehab brick in Chicago**. We fund both. Do not send a plat file to the [Will County fix-and-flip page](/fix-and-flip-loans-will-county-il/). That page is existing-stock rehab.

## GC selection in Chicago — lender perspective

We look for Chicago DOB permit history, not only suburban tract work. The GC must be bonded and insured at limits matching project size. We want references on 2–4 unit vertical, not only SFR. Subcontractor bids should be transparent. Post-close change orders need approval. The cheapest GC is rarely the fastest to CO. Carry kills deals more than bid spread.

## Environmental and soil surprises

Infill lots may hide an underground tank or fill soil. Order a Phase I on commercial-adjacent lots. Order soil borings on vacant land before you close. Construction lenders do not fund remediation surprises mid-build.

## Demolition delay is its own loan calendar

A Chicago wrecking permit is not a line item you pay at the first vertical draw. It is a separate [DOB](https://www.chicago.gov/city/en/depts/bldgs/provdrs/permits.html) workflow. Utilities must disconnect. Cook County records the demolition before the new-construction permit issues. Orange-rated structures can add a **90-day** hold. That is dead carry on land you already closed.

Sequence the file so demolition and site clearing are funded before the construction facility converts to vertical draws. Confirm gas and water disconnect dates with the city before you wire land money. A stalled disconnect can idle a lot for a month in January. Interest still accrues.

## Aldermanic review is not a permit fee

Chicago infill sits in a ward. Community meetings and aldermanic questions add weeks that do not appear on the DOB fee calculator. A two-flat that is by-right on paper can still wait on a meeting about parking, height, or a coach house. Budget that calendar in the interest reserve. Do not treat a “by-right” zoning letter as a start date.

Affordable Requirements Ordinance rules can attach on larger unit counts. A two-unit or three-flat infill often stays under the trigger. A larger assemblage may not. Get legal review before you option a lot that you plan to combine.

## RLTO if you hold the new building

A new three-flat inside Chicago is still a Chicago rental if you keep it. [RLTO](/chicago-rlto-landlord-compliance-investor-guide/) covers deposits, heat, and renewals. Collar-county DSCR math that ignores RLTO overstates NOI. If the exit is a sale to an owner-occupant buyer, RLTO is not the operating problem. If the exit is [DSCR](/dscr-loans-chicago/), model city landlord rules in the expense line.

Cook County transfer tax and Chicago real estate transfer tax also hit a sale. An 8% all-in sale-cost assumption is a planning band, not a closing statement. Run the actual stamps on your PIN.

## Coach houses are a second dwelling, not a finish upgrade

Chicago’s ADU expansion makes rear coach houses and basement units a real second rent stream on many RT lots. That is construction, but the overlay is the risk. Do not hide an ADU inside a “spec SFR” label if the city treats it as a second dwelling. Read [ADU zoning](/adu-zoning-basics-chicago-edition/) and [coach-house financing](/chicago-coach-house-adu-financing-guide/) before you draw a rear structure on the site plan.

A basement conversion without a legal CO does not count as DSCR income. Separate entrance, egress, and a meter path belong in the permit set, not in a punch list after framing.

## What Chicago construction files must show

Stamped plans. A Chicago-licensed GC whose class matches project value. A line-item budget with **10%–15%** contingency. As-completed comps from the same product, not a North Shore custom. A written exit: unit sale, building sale, or DSCR hold. An interest reserve that covers winter and DOB slip, not a six-month flip reserve on a fourteen-month build.

We pass files that use in-town house comps to value a lot that still has an orange-rated building on it. We pass GCs with only suburban tract resumes on a three-flat vertical. We pass budgets with no demolition line and no weather contingency.

## Water, frost, and radon are city cost lines

Chicago prices building permits by square footage, not by a cheap “base minimum” that circulates online. The Illinois spec page has the calculator and the **$2,350** residential floor. This page’s point is simpler. Run the calculator on _your_ square footage before you lock land.

Water service is a separate permit. Frost footings sit **42 inches** below grade. New residential construction needs radon-resistant rough-in under Illinois law. Those three items do not appear in a Texas subdivision budget. They belong in yours.

## Education links

-   [Illinois spec home construction loans](/spec-home-construction-loans-illinois/) — DOB fees, FAR, GC classes
-   [New construction loans for investors](/new-construction-loans-for-investors/) — pick spec, land, or plat
-   [Will, Kane, McHenry small-plat financing](/will-kane-mchenry-small-plat-financing-guide/)
-   [Subdivision development guide](/subdivision-development-guide/) · [subdivision financing](/subdivision-development-financing/)
-   [Two-flat vs three-flat financing](/chicago-two-flat-three-flat-financing-guide/)
-   [ADU zoning Chicago](/adu-zoning-basics-chicago-edition/)
-   [Condo deconversion financing](/condo-deconversion-financing-chicago/)
-   [Chicago infill teardown economics](/blog/chicago-infill-teardown-rebuild-economics-2026/)
-   [Hard money hub](/hard-money-lenders-chicago/)

## FAQ

### Do you fund condo deconversion construction?

Case-by-case. Legal and HOA complexity require upfront review.

### Is modular construction eligible?

Yes with approved manufacturers and a documented Chicago inspection path.

### Do you fund Chicago ADU-only projects?

Rear ADU and basement conversion loans are smaller checks. They often fit [HELOC or second-position](/second-position-dscr-loan-request/) stacks. Ground-up ADU with full permits may qualify if bundled with primary unit renovation.

## Cost per square foot reality (2026 Chicago)

| Build type | All-in $/sf (vertical) |
| --- | --- |
| Standard 2-flat renovation | $120–$180/sf |
| New vertical 3-flat | $200–$280/sf |
| High-spec Lincoln-adjacent | $300+/sf |

Material and labor inflation stabilized. Skilled trades remain tight. Lock GC pricing before you close land.

## Interest reserve and carry

On a **$700K** construction loan at **11.5%** IO, monthly interest is about **$6,700**. A 14-month build plus lease is about **$94K** of interest reserve. Sponsors who under-reserve get squeezed at month ten. We stress-test reserves in underwriting so you finish the building, not fire-sale the half-built frame.

---

[Discuss your Chicago ground-up project](/scenario/) · **(833) 264-7776**

## Chicago new construction — draw and carry file gates (2026)

Chicago construction files fail when **DOB inspection cadence** adds **4–8 weeks** unmodeled, or **$94K interest reserve** on a **$700K** loan is omitted from the pro forma.

-   **Worked file:** Lot **$95K** + vertical **$285K** two-unit — presold unit **$310K** prior to CO
-   **New 3-flat band:** Land **$180K** + vertical **$520K** → stabilized **$950K–$1.05M** · **$1,800–$2,100/door**
-   **Carry:** **$700K** at **11.5% IO** — **14-month** build + lease ≈ **$94K** interest reserve
-   **Cost/sf:** New vertical **$200–$280/sf** · high-spec Lincoln-adjacent **$300+/sf**

**Underwriting anchor:** Worked file: Lot $95K + vertical $285K two-unit — presold unit $310K prior to CO — replay corridor-specific carry and exit math from this page before locking bridge, flip, or DSCR term. Construction **100% LTC** on qualified file · [DSCR on retained unit](/dscr-loans-chicago/) · **(833) 264-7776**.

## Related financing resources

Explore Jaken Finance Group programs and trusted reference material connected to this topic.

### On this site

-   [Hard money lenders Chicago](/hard-money-lenders-chicago/)
-   [Fix and flip loans Chicago](/fix-and-flip-loans-chicago/)
-   [Chicago BRRRR strategy guide](/chicago-brrrr-strategy-guide/)
-   [Chicago RLTO compliance guide](/chicago-rlto-landlord-compliance-investor-guide/)

## Chicago loan programs

-   [Investment Property Financing Chicago](/investment-property-financing-chicago/)
-   [Hard Money Lenders Chicago](/hard-money-lenders-chicago/)
-   [Fix and Flip Loans Chicago](/fix-and-flip-loans-chicago/)
-   [DSCR Loans Chicago](/dscr-loans-chicago/)
-   [Bridge Loans Chicago](/bridge-loans-chicago/)
-   [Commercial Lending Chicago](/commercial-lending-chicago/)
-   [Cash Out Refinance Chicago](/cash-out-refinance-chicago/)

## Frequently asked questions

Do you fund condo deconversion construction?

Case-by-case — legal and HOA complexity require upfront review. See condo deconversion financing Chicago for bulk buyout capital stacks.

Is modular construction eligible?

Yes with approved manufacturers and Chicago inspection path documented.

Do you fund Chicago ADU-only projects?

Rear ADU and basement conversion loans are smaller checks — often better suited to HELOC/second or personal+credit line stacks. Ground-up ADU with full permits may qualify if bundled with primary unit renovation.

Should I use this page or Illinois spec home construction loans?

Use this page to pick the Chicago product: teardown three-flat, coach-house ADU, luxury collar spec, or a Will/Kane/McHenry plat. Use the Illinois spec guide for DOB fee tables, FAR, GC classes, and city-versus-collar permit math.

Do you fund small plats in Will, Kane, or McHenry from the Chicago construction page?

Yes, but those files are land, horizontal, and finished-lot loans — not a Chicago DOB teardown. Send them through the Will, Kane, and McHenry small-plat guide so the plat calendar and impact fees are in the package.

## Ready to fund your next deal?

Get pre-qualified in minutes. Speak with a lending specialist or submit your scenario online.

[Get Construction Terms](/newbuild/?source_page=new-construction-loans-chicago&property_area=Chicago) [Contact Us](/contact-jaken-finance-group-by-email/)

Or call [(833) 264-7776](tel:8332647776)
