Updated
A completed apartment property may be able to refinance before full lease-up through a lease-up bridge loan or an eligible early permanent loan. If the construction loan is nearing maturity, ask the current lender about an extension while you test whether net proceeds from a new loan can cover the payoff. Keep the application, rate lock and funding dates on the same calendar.
Apartment lease-up and payoff calculator
Check how many occupied units are needed for your lender’s test and how much cash the refinance would leave to cover.
Estimated results
- Physical occupancy
- 60.0%
- More net move-ins needed
- 6
- Cash needed for payoff and fees
- $1,000,000
How the estimate adds up
- Use actual occupied units and the target provided by your lender. The calculator rounds the target up to a whole unit. Ask about any additional occupancy, income and closing tests.
Borrowers
Submit a lease-up refinanceBrokers with a client deal
Sign up as a brokerCompare the options · Work through the $7.8M payoff example · Prepare your request
What are your options before the construction loan matures?
| Option | What to confirm first |
|---|---|
| Extend the construction loan | The notice deadline, eligibility, extension fee, reserve requirements and any required paydown. |
| Refinance into a lease-up bridge loan | The initial advance after holdbacks and fees, cash needed through leasing, and a realistic permanent exit. |
| Pursue early permanent financing | When the lender can lock and close, what occupancy and collections it will accept, and the net loan proceeds. |
Start by confirming what is complete today. Get the certificates of occupancy and list the units they cover. Identify any open work, final inspections, unpaid construction bills or conditions on the current loan. If major work still needs to be funded, use the mid-construction refinance and cost-to-complete guide to model the remaining work and how it affects a new loan.
For a finished property, the decision depends on two clocks. One is the time left under your current loan. The other is the time it takes to turn signed leases into occupied units and rent collections. Ask each lender to identify the earliest point it could take the next step, and the conditions you would need to meet. Get the payoff and liquidity estimates side by side before paying for a new loan application or third-party reports.
Does 80% leased mean the building is ready to refinance?
Consider a hypothetical apartment development with 40 units and certificates of occupancy for every unit. It has 32 signed leases and 24 physically occupied units. That is 80% leased and 60% physically occupied. The construction loan matures in 120 days. Those numbers describe separate parts of the refinance file.
| Leasing record | What it tells a lender |
|---|---|
| Signed leases | The tenants who have agreed to rent, including future move-in dates and concessions. |
| Physical occupancy | How many units tenants have actually moved into and occupy. In this case, 24 of 40. |
| Billed rent and collections | What rent came due, what was collected, and which occupied units are in a free-rent period or behind. |
| Operating expenses | Costs to run the property now and costs expected as more tenants move in. |
Have the property manager reconcile the rent roll at a specific date. Include a move-in schedule, any expected move-outs, the dates concessions end and actual deposits to the operating account. Identify actual rent collections separately from tenant deposits and other receipts. Ask the lender how it measures economic occupancy or recognized income, especially when leases are signed for future dates.
A signed lease can be useful evidence of demand. A month of scheduled rent for a tenant who moves in next week is still a forecast today. If a unit is occupied during a free-rent period, show the actual first payment date. When two lenders use different occupancy definitions, send them the same detailed records so each can apply its own test.
When could an early permanent lender review the deal?
Fannie Mae’s published near-stabilization term sheet lists 75% minimum physical occupancy at rate lock and certificates of occupancy for 100% of residential units at commitment. In the 40-unit example, the occupancy test translates to 30 occupied units. The property needs six more net move-ins to reach that count. Ask the lender to verify the remaining program conditions and what evidence its underwriter wants to see. Fannie Mae near-stabilization term sheet
Freddie Mac also publishes a Lease-Up execution. Its product materials describe conditions for eligible properties and possible credit enhancement. Ask an agency-approved lender to identify which execution it would consider, when it can proceed and how any reserve, guaranty or other credit support would affect your cash. Freddie Mac Lease-Up product snapshot
If the manager can add three occupied units per month after move-outs, the example reaches 30 units in roughly two months. Compare that date with the time a lender needs for appraisal, reporting and closing. Keep the current lender’s extension dates in view. A lender can begin a review today and still need more evidence before moving forward. Work from the actual move-in schedule and update the property count when it changes.
Can a $6.9M refinance pay off a $7.8M construction loan?
Assume the 40-unit property has a $7.8M dated payoff. A lender gives an illustrative $6.9M gross refinance indication based on its own income and valuation assumptions. The estimate has $100K in closing costs and assumes the quoted proceeds are fully available at closing.
| Payoff check | Illustrative amount |
|---|---|
| Existing construction payoff | $7.8M |
| Proposed gross refinance amount | $6.9M |
| Closing costs deducted at settlement | $100K |
| Net cash available toward payoff | $6.8M |
| Cash the sponsor would need at closing | $1M |
Ask for a current payoff letter, including the date through which interest is calculated and any other amounts due. Then ask whoever quoted the refinance to break out funds available at closing and funds held in reserve. If the payoff date changes, update both sides of the calculation. A reserve the lender controls may be available later for specific uses, so confirm whether it can be applied to the payoff today.
The quote may rely on cash flow the lender still needs to verify. Show expected net operating income after vacancy, concessions and expenses. Debt-service coverage compares that income with the annual payments on the proposed loan. If either the value or the coverage test reduces proceeds, rerun the gap before agreeing to a closing date. The construction exit calculator can help compare both limits. The 40-unit construction financing example shows how the same test fits into planning before the build.
What if signed tenants move in a month late?
Build a short cash schedule that shows when each new tenant will start paying. Use your operating account and rent roll to check the starting month. Then subtract expected move-outs, record free rent and put the next month’s property expenses and loan payment on the schedule. That gives you a better estimate of the cash you will need than a single stabilized income number.
For a separate stress test on the 40-unit property, assume three signed tenants at $2,400 per month each are due to pay their first full month. If their move-ins and first payments all shift a month, $7,200 of rent arrives later. If your forecast already showed a $34K cash need for that month and everything else stays the same, the need increases to $41,200. This is a timing test. Confirm how the actual lease handles payments if a move-in changes.
Keep the occupancy effect next to the cash effect. Three delayed move-ins can push back the date you reach a lender’s occupancy threshold. A new move-out can change the count again. Ask your property manager to update both the dates and the amounts each week as maturity gets closer.
Can an extension buy enough time?
Read the extension provision before judging how much time you have. An option can have notice requirements, a fee, reserve funding, financial conditions or other obligations. Ask the lender to confirm the dates and conditions in writing. If you already received a default or enforcement notice, have counsel confirm the deadlines and the effect on your options.
In the example, suppose the extension notice is due 60 days before maturity. With 120 days left, the sponsor has 60 days from today to give that notice. At the modeled pace of three net move-ins per month, the building may reach 75% physical occupancy around the time notice is due. Waiting until the occupancy test is met would leave little time to deal with a slow month or a changed lender condition.
Now price an illustrative 60-day extension. At a modeled 0.50% fee on $7.8M, the fee is $39K. If the property needs $34K of sponsor cash per month after rent collected, operating costs and loan payments, two more months require $68K of carry. Together that is $107K, before any required paydown or reserve deposit. Put those amounts on the dates they are due, then recalculate the expected payoff after the extension.
Ask what the extra time is expected to accomplish. For example, identify the additional move-ins and months of rent collections the permanent lender expects to see. If that progress would still leave a payoff gap, include a committed cash source or compare a different financing plan. Commercial loan maturity planning
How much lease-up bridge money actually arrives at closing?
A bridge loan can repay construction debt and give you more time to lease, if the lender will advance enough and the deal can support the bridge and exit. Compare cash delivered on closing day with the payoff. Then check how the monthly payments, reserve draws and eventual bridge payoff affect the plan.
Suppose an illustrative bridge quote has a $7.9M total commitment and $300K held for later advances. It would deliver $7.6M before fees on day one. After $100K of assumed closing costs, $7.5M would be available for the payoff. The sponsor is $300K short against the $7.8M payoff. Ask what the held money can fund and when you could draw it.
Also estimate repayment at the end of the bridge. The sponsor may owe more than the initial advance if it taps reserved funds. Test the future permanent loan with a slower leasing schedule and the full expected payoff. If additional interest and two sets of closing expenses make the total cost larger than you can support, take that finding back to the current lender as part of the extension discussion.
Compare written terms using the same leasing and operating assumptions. Record fees, prepayment provisions, interest on advances, reserve release conditions and the date by which each lender would need the file. See the difference between a term sheet, letter of intent and loan commitment so you know which conditions are still open.
What if final construction bills are still open?
Even with occupancy certificates, the project can still have retainage, final contractor invoices or small items to finish. Make a closeout list and show which costs the construction loan has already funded. Attach the contractor’s remaining invoice or approved amount. Ask what the existing lender needs to release its last funds and what the new lender needs before it can close.
For instance, suppose the new lender requires an additional $120K escrow for closeout from the $6.9M refinance indication. After the existing $100K modeled closing costs and the additional escrow, $6.68M would be available to pay the $7.8M loan. The cash gap grows to $1.12M. Ask who controls the escrow, what releases it and whether any of the same bills already appear in the payoff or closing costs.
Identify whether an open item affects work needed to operate or only when a final payment will be released. That distinction can change the lender’s approach. If work still prevents part of the property from opening, disclose which units are affected, the cost to finish and the date they can start producing rent. For open storefront work, calculate how a retail holdback affects the construction payoff.
What should you send for a lease-up refinance review?
Put the maturity date and extension notice date at the top. Add the address, unit count, completion date, estimated payoff, loan amount requested and cash available to close. Document any disputed items in the payoff or the construction closeout.
- Completion. Certificates by building and unit, any open inspection items and the expected date for final construction bills.
- Leasing. A dated rent roll, signed leases, move-ins, pending move-ins, concessions and expected move-outs.
- Collections. Rent due and paid, late balances and operating statements. Show monthly results through the latest closed month.
- Loan and cash. Payoff, current loan and extension terms, bridge or permanent estimates, and the source and timing of any cash needed to make the payoff.
Give both the current results and the forecast to the reviewing team. Show what would happen if leasing runs one month behind or collections fall short of plan. Make clear which decision you need first, such as how much a lender can fund at closing or whether a longer term would let you meet a leasing milestone.
Request a commercial refinance review when the completion and payoff figures are in hand. If maturity or the extension notice date is close, include that date in the first line of the request. If the apartment loan request is $10M or more, use the focused large multifamily review. Brokers can submit through the broker portal.