Planning illustration, not a funded transaction. This hypothetical apartment development uses a $22 million construction commitment within a $34 million project budget. It shows how construction uses, staged funding and a permanent-loan exit can be considered together.
No real developer, site or closing is represented. Rates and financing constraints are assumed calculation inputs, not program pricing, an offered loan structure or a promise of permanent financing.
What does the complete development budget include?
The example includes land, construction, professional costs, a contingency and a reserve. A real development budget would need a detailed schedule supporting these categories and identifying which costs the proposed loan can fund.
| Modeled use | Amount |
|---|---|
| Land | $5,000,000 |
| Hard construction costs | $24,000,000 |
| Soft costs | $2,000,000 |
| Contingency | $1,500,000 |
| Carrying reserve | $1,500,000 |
| Total development uses | $34,000,000 |
| Requested construction commitment | $22,000,000 |
| Funding needed outside the loan | $12,000,000 |
The requested loan equals approximately 64.7% of these modeled uses. This arithmetic is not a quoted loan-to-cost limit. Recognized land equity, accepted project costs, required cash and sponsor liquidity would be established for the actual request.
If the sponsor already owns the land, document its purchase history and existing debt. The $5 million land line does not by itself establish how much equity credit a lender will recognize or whether a land payoff reduces usable proceeds.
How are initial proceeds different from later construction draws?
The assumed commitment consists of a $5 million initial advance plus $17 million of future funding. Future funding is released under the loan’s approved draw conditions; it is not cash the developer can spend freely at closing.
For a real project, align contractor payments with draw requests, inspections, lien documentation and any reimbursement requirements. Identify expenses the sponsor must pay before a draw is released. Also explain who funds overruns and how approved changes affect the remaining budget.
Neither a contingency nor an undrawn commitment eliminates the need for sponsor cash. Their availability depends on the original loan documents, remaining eligible costs and any required lender consent.
Which assumptions can you change in the planning model?
Hypothetical planning illustration
Change the capital stack. Test the exit.
These are example assumptions, not Jaken Finance Group terms or a funded transaction. Model a financing gap before it becomes a closing problem.
The annual debt constant is annual P&I ÷ original loan principal, not the interest rate. Use a lender payment calculation for the proposed amortization. All percentages are assumptions.
Use valid figures. Initial advance cannot exceed the commitment.
- Funding needed outside this loan
- —
- Future funding allocation
- —
- Full-draw interest per month
- —
- Current NOI / full-draw interest
- —
- Exit capacity by LTV
- —
- Exit capacity by coverage
- —
- Modeled exit loan capacity
- —
- Residual after modeled payoff + exit costs
- —
Full-draw interest is a carry stress test, not cumulative construction interest or an interest-reserve budget. Future funds are subject to draw requirements. Funding outside the loan may include sponsor equity or other approved sources; an existing ownership basis is not shown here.
Exit proceeds use the lower of assumed LTV capacity and assumed coverage capacity. The model assumes full loan principal remains due, includes the entered exit costs, and excludes unentered fees, accrued interest, penalties and distributions.
Request my $10M+ multifamily reviewUse the model to examine how changes in budget, exit income and value affect the funding picture. Replace the assumptions with supported project figures before using the analysis in a financing discussion. A calculator result is not a loan approval.
How should full-drawn interest be interpreted?
At an assumed 10% interest-only rate, a fully drawn $22 million balance produces $2.2 million of annual interest, or approximately $183,333.33 per month.
This is a full-draw stress illustration, not cumulative construction interest. During construction, the outstanding balance changes as funds are advanced. An actual interest budget requires the draw schedule, dates, calculation method and treatment of any financed interest. Applying the full commitment to every construction month would not describe that changing balance.
The $1.5 million reserve is an assumed budget item, not proof that all interest and carrying costs are covered. Review taxes, insurance, construction delays and the period before sufficient rent is collected. Distinguish reserve-funded expenses from costs the sponsor must pay directly.
What supports the assumed permanent-loan exit?
The base case assumes completed operations produce $2.6 million of annual NOI and an exit value of $40 million. The refinance model uses a 65% maximum loan-to-value ratio, 1.25 debt-service coverage ratio and 8% annual debt constant.
The debt constant expresses annual debt payments as a share of principal. It is separate from the assumed construction interest rate.
| Exit calculation | Result |
|---|---|
| Value limit: $40 million × 65% | $26,000,000 |
| Income limit: $2.6 million ÷ 1.25 ÷ 8% | $26,000,000 |
| Modeled refinance capacity | $26,000,000 |
| Assumed construction payoff | $22,000,000 |
| Assumed refinance exit costs | $800,000 |
| Residual before other adjustments | $3,200,000 |
Both assumed sizing limits produce $26 million. The $3.2 million residual is an arithmetic difference before other adjustments, not guaranteed sponsor proceeds or a return projection. The actual payoff could include amounts absent from the simplified model.
A finished building also needs an operating story: delivery dates, leased and occupied units, concessions, collections and expenses. Construction completion alone does not establish the modeled NOI or refinance eligibility.
What if the completed property’s income and value are lower?
Hold the refinance constraints unchanged but reduce annual NOI to $2.2 million and value to $34 million. Value-based proceeds become $22.1 million, while income-based proceeds become $22 million.
The lower $22 million capacity falls $800,000 short of the assumed $22.8 million payoff and exit costs. That gap needs an identified solution, such as additional sponsor cash. A future extension, reserve release or revised repayment arrangement would need review under the original loan documents and any required consent.
What should a developer or broker submit next?
Provide the site, unit count, plans, approval status, contractor, detailed budget, schedule and sponsor resources. Identify existing liens and land debt, remaining equity contributions, the target construction start and the proposed repayment path.
Read about multifamily construction financing above $10 million, compare bridge financing for existing apartments, and explore the other hypothetical examples.
Brokers: submit through the broker portal. Developers and borrowers: request a large multifamily deal review. Availability, leverage, guarantees, pricing and closing timing are confirmed for the actual transaction.