Skip to main content

More than $535 million in real estate loans.

Indiana Investor Guide

Compare Indianapolis Hard Money Financing

Compare Indianapolis hard money financing using contractor bids, initial advances and repair draws. Test the cash needed to finish work and refinance a rental.

When comparing Indianapolis hard money financing, use the repair plan as the starting document. The loan needs to support the work that actually exists, on the dates it must be paid. A high loan-to-cost percentage is less helpful if the first draw arrives after the contractor’s largest deposit is due.

This editorial guide comes from Jaken Finance Group, a financing provider. It does not rank competitors or claim access to verified citywide lender pricing. Its examples are hypothetical. The goal is to compare written proposals against one construction budget and a supportable exit, so that differences are visible before closing.

Define the work before discussing leverage

Identify the current authorized unit count, occupancy, utilities and condition. Distinguish cosmetic updates from replacement of systems and from changes that affect layout or use. A duplex with shared mechanical equipment needs a different work explanation from a vacant single-family house receiving paint and flooring.

Use photographs and measured quantities to connect the scope to the building. A contractor’s total without included work, exclusions or payment stages cannot show whether the financing covers completion. Ask which trades are responsible for each task and which items need specialist review before the budget is considered ready.

The Indianapolis rehab budget guide explains how to build a bid-based estimate. Its worked figures are teaching inputs, rather than evidence that a particular citywide price applies to the subject building.

Put permit and inspection questions into the schedule

Use the city’s building permit information and Department of Business and Neighborhood Services as official starting points for the subject address and work. Confirm the responsible authority and requirements rather than copying a schedule from a different project.

Identify the tasks that cannot proceed until an inspection or approval is complete. Ask the contractor whether these dependencies are reflected in the payment schedule. The lender’s draw inspection is a financing step and should not be treated as a substitute for an approval required by the authority having jurisdiction.

Keep the actual permit, inspection and correction records in the project folder. If a prior owner started work, determine which parts are complete, which records remain open and who must obtain the next approval. An assumption that old work is acceptable can create both a budget gap and an exit problem.

Read the initial advance and holdback separately

Consider a hypothetical $180,000 purchase and $60,000 rehab budget. Proposal A commits $216,000, with $162,000 at purchase and $54,000 reserved for future work. The purchase gap is $18,000 and the repair gap is $6,000, for $24,000 before fees and carrying costs.

Proposal B commits $204,000, with $171,000 at purchase and $33,000 reserved for work. Its purchase gap is only $9,000, but the repair gap is $27,000, for $36,000 total before other costs. The second proposal provides more money at purchase while funding less of the whole project.

Model comparisonAB
Full commitment$216,000$204,000
Funds toward purchase$162,000$171,000
Funds reserved for work$54,000$33,000
Purchase gap$18,000$9,000
Repair gap$6,000$27,000
Combined gap before fees and carry$24,000$36,000

Neither set of figures is an offer. They show why the borrower should compare dollars by purpose and date. Ask the lender to reconcile its stated leverage percentage to the cost basis, valuation limit and funding schedule used for the actual file.

Check contractor cash before the first draw

Suppose the contractor requires a $12,000 mobilization payment and $8,000 for ordered equipment before inspection of the first milestone. The borrower may need $20,000 temporary working cash even if some approved costs will later be reimbursed. Confirm the process instead of assuming the entire holdback is available immediately.

Map cumulative payments and expected draws across the schedule. Find the largest temporary deficit and determine its source. Do not double count a reimbursable outlay as both a permanent extra cost and a separate reserve, but do ensure the cash exists when the invoice is due.

Ask how change orders, partial completion and disputed work affect draws. Keep written approvals before expanding the scope. The lender’s maximum commitment normally remains a limit until a revised amount is expressly approved; a contractor overrun does not automatically increase it.

Compare the full financing cost

Use identical loan balance and holding assumptions when comparing rates. Identify interest on committed versus disbursed funds, points, third-party fees, draw charges, minimum-interest terms and extension provisions. Keep costs that are estimates visibly separate from costs stated in the proposal.

On an assumed $200,000 fully outstanding balance, 10.5% interest-only is $1,750 monthly. Eight months costs $14,000 interest. A two-month delay adds $3,500 interest at the same rate and balance, before property expenses or any extension fee. That is a model of timing exposure, not a quoted Indianapolis rate.

An apparently cheaper quote can require more cash upfront or provide less time to finish the work. Compare those effects with the contractor’s actual schedule. Ask whether the note permits the expected project duration and what happens if the exit does not occur on time.

Size the rental exit from supported income and value

A completed rehab needs a separate refinance review. Suppose the assumed stabilized value is $320,000 and the selected refinance uses 75% LTV. That creates a $240,000 value-based ceiling. If income and the proposed payment only support $220,000, the smaller balance controls before other conditions are considered.

After $8,000 in hypothetical refinance costs, $220,000 gross produces $212,000 available toward payoff. A $216,000 bridge payoff then creates a $4,000 contribution, rather than cash returned to the borrower. Additional escrows or payoff charges could increase that need.

Use the refinance exit planner to test that gap. The Indiana DSCR guide explains the rental route. A future appraisal gain should not be the only repayment plan when actual rent and loan terms support less debt.

Separate rental coverage from operating cash

Accepted rent of $2,600 and PITIA of $2,000 produce 1.30 residential coverage. If vacancy, maintenance, management and other operating allowances total $500 monthly, the remaining cash is only $100 before omitted capital expenses and income taxes.

A lower rent of $2,400 reduces coverage to 1.20 and cash to negative $100 with the same costs. Test both measures using the DSCR calculator. A passing ratio does not establish that the owner can carry a turnover, major system replacement or refinance delay.

Review the program and submit a complete file

Jaken Finance Group publishes 8.99%–13.5% fix-and-flip pricing and six-to-twelve-month terms, subject to underwriting. Qualified projects up to $2.5 million may access up to full loan-to-cost financing, limited by the lower 75% ARV cap. The published closing target is seven to ten business days after required conditions and appraisal-payment requirements are met.

Use Indianapolis hard money financing for the local program route. Submit the contract, photos, line-item budget, contractor schedule, available cash and intended exit through the scenario intake. Include the issue most likely to change the file: an unresolved unit, system repair, title item or refinance shortfall.

Finish the comparison with a dated list of what each proposal has reviewed and what remains conditional. That makes the decision concrete: how much money arrives, what the borrower contributes, how the work gets completed and what evidence supports repayment.

If the project includes occupied units, show how work changes access, utilities and rental income during construction. Add the cost of any planned vacancy to the carrying budget. That information helps reconcile the contractor schedule with both the loan term and the rental exit instead of assuming full rent throughout the renovation.

Compare financing for the unit you can rent today

On an Indianapolis duplex, document mechanical systems and metering by side. Send both lease records, current occupancy and a scope that separates each unit from shared systems. A furnace replacement, panel upgrade or meter problem can hold one side out of service while the other keeps paying rent. List the contractor cash needed and any required inspection before treating that unit as ready for lease.

Use the City of Indianapolis permit portal to look up or request the relevant permit record. Ask the department about any open permit or contemplated change of use. When using sales for a Fountain Square or near-east-side property, show side-by-side the unit count, work completed and proximity to the subject. Put a lease or rent comparable next to each unit instead of relying on a neighborhood-wide rent figure. Indianapolis permit and records portal

Worked example: a staggered Indianapolis duplex turnover

In an illustration, one unit pays $1,100 and the finished second unit could rent for $1,000. A three-month delay leaves $3,000 of expected rent out of the budget. Add any owner-paid utilities and winter carry to the forecast. Ask the acquisition lender which work triggers a partial draw and the takeout lender which inspections and rent records it needs. That comparison helps determine whether the property needs a larger reserve or a longer term.

Prepare the lender file for a Fountain Square duplex

For a hypothetical $128,000 purchase with a $56,000 scope, sort contractor bids by side and by shared building system. Ask your contractor which work will take the occupied side offline and for how long. Compare the draw dates with the payments needed to retain your contractor. If distinct electrical service is required for the exit, identify the utility and permit steps before assuming the work can be completed on the interior renovation schedule.

Keep a separate rent and occupancy timeline for both units. Before treating the projected gross rent as available income, show the refinance lender which side is operating and what the completed scope will change. Use a permit search or a written records request to resolve missing documents early. Ask the short-term lender for the cost and notice deadline of an extension in case the heating, electrical or inspection schedule slips. Indianapolis public records requests

Frequently asked questions

How should an Indianapolis investor compare hard money proposals?
Use one itemized repair scope and the same purchase and exit assumptions. Compare the initial advance, rehab holdback, draw conditions, fees, interest basis, term and required borrower cash. Check what remains subject to underwriting.
Should I use a citywide rehab cost per square foot?
Use property-specific contractor bids and measured quantities. A blended cost per square foot can summarize a completed budget, but it does not explain differences in systems, unit count, condition, permits or site work.
Can the total loan commitment pay every contractor deposit?
Not necessarily. A commitment may reserve part of the balance for later inspections or reimbursement. Compare the contractor's required payment dates with the actual draw process, and retain temporary working cash where needed.
What if the Indianapolis rental refinance is smaller than the bridge payoff?
The owner may need additional cash, a different structure or another supported exit. Refinance approval is separate from the bridge and depends on income, value, property eligibility, credit, liquidity and program requirements.

Ready to fund your next deal?

Get pre-qualified in minutes. Speak with a lending specialist or submit your scenario online.

Or call (833) 264-7776

FREE INVESTOR RESOURCE

Unlock your download

Submit your email to download your results. Your deal inputs stay in this browser.

Submit your email to access this free resource. Privacy policy.