    05 / Prepare the conversation

    Construction financing readiness and document checklist.

    Organize the evidence, name the open questions, and turn a promising concept into a useful financing conversation.

    Open your checklist Read the guide9 minute guide · Interactive checklist

    At a glance

    Prepare a concise project summary, site and ownership information, current plans, construction scope and schedule, sources and uses, equity assumptions, draw timing and exit evidence. Label missing or unconfirmed items. The checklist organizes a financing conversation; completion does not certify accuracy, eligibility or approval.

    In this guide

    Put it into practice

    Your project preparation checklist

    Check what you have prepared, then print this page for your project file.

    0 of 9 items prepared

    Selections are not uploaded or saved. Refreshing clears them.

    Prepare a concise project summary

    Begin with a one-page description covering location, business purpose, planned use, unit count, development stage, budget, loan request, equity and intended repayment. Add the schedule you are working toward and the decisions still outstanding. Someone unfamiliar with the site should be able to understand what must happen next.

    The checklist organizes preparation suggestions, not universal lender requirements. Mark an item only when you have reviewed the underlying material. A full checklist does not verify its accuracy or establish eligibility. Your selections remain in the current page and can be printed with the guide; refreshing the page clears them.

    Organize evidence around the decision

    For the site, assemble the address, ownership or purchase agreement and the status of zoning, access and utilities. For the build, gather the latest plans, permit status, contractor proposal, line-item budget and schedule. For the sponsor, prepare an ownership chart, relevant project history and evidence of the proposed equity source. Keep sensitive personal and account documents for a secure channel designated by the recipient.

    For repayment, bring the rental assumptions and comparable evidence or the unit-sales plan. Include your calculator scenarios with the assumptions clearly visible. Date each document so the reviewer can distinguish the current plan from an earlier version. A simple file index is often more useful than an unstructured folder of attachments.

    Questions to resolve before committing

    Ask which costs and land contributions will be recognized, what is funded at closing, when equity must be contributed, and how draws are reviewed. Confirm the interest calculation, reserve treatment, fees, guarantees, insurance and maturity provisions. For unit sales, ask about partial releases. For a refinance, ask what evidence the future lender would require and when it can be produced. Record answers against the proposed documents rather than relying on a general description.

    A short glossary

    Commitment: the total facility amount contemplated by the agreement. Advance: a funded portion of that facility. Contingency: a budget allowance for uncertain costs. LTC: loan divided by the specified project-cost denominator. LTV: loan divided by the specified property value. NOI: property operating income after operating expenses, before debt service. DSCR: NOI divided by annual debt service. Takeout: replacement financing used to repay existing debt. Release payment: the required payment associated with releasing specified collateral, as governed by the loan documents.

    Use a document index instead of an attachment pile

    Organize the package so a reviewer can follow the same project through every file. Start with a document index showing the file name, purpose, date, owner and current status. Replace vague labels such as “final budget” with a clear version and date. Keep earlier versions available in your own records while identifying which one supports the current financing request.

    The NCUA construction and development guide discusses feasibility and project monitoring in a credit-union context. It supports the value of organized evidence, but it does not establish the document requirements of this supplied financing scope. Ask which documents are needed for your actual transaction before sending sensitive materials.

    Preparation areaUseful informationQuestion it should help answer
    Project summaryUse, units, stage, amount, term and exitWhat is the actual proposal today?
    Site controlOwnership or purchase information and relevant datesHow is the site controlled, and what remains unresolved?
    Plans and approvalsCurrent drawings and an accurate approval-status descriptionWhat work is planned and what must happen before it can proceed?
    ConstructionContractor scope, exclusions, milestones and pricing datesWhat will completion require in cost and time?
    Sources and usesCosts, proposed debt, contributions and land-credit assumptionsDo the funding sources reconcile with the uses?
    RepaymentRental or sales evidence, estimated costs and payoff assumptionsCould the intended exit retire construction debt?

    The index should expose missing information. An empty status cell is easy to overlook; “pending contractor revision” with a named follow-up owner is more useful. Avoid marking a document current simply because it is the newest attachment in an email chain.

    Worked preparation example: a six-unit rental proposal

    Suppose a sponsor proposes a six-unit apartment building, requests $1.6 million and models an 18-month term. The project summary identifies the rental exit, current site status and the next construction milestone. Those facts give the reviewer a coherent starting point. They do not establish that the proposed loan or schedule is available.

    The budget shows $2,175,000 of entered uses. A $1.6 million modeled loan leaves $575,000 of equity, with a hypothetical $250,000 of accepted land equity and $325,000 of remaining cash. The package should label the land credit unconfirmed until its actual treatment is resolved. Evidence of ownership is different from confirmation of accepted equity credit.

    Next, attach the draw and interest scenario with its own assumptions. If it uses a different commitment from the budget, explain the discrepancy before presenting the files together. Carry the selected payoff into the rental exit model, then record what the income and takeout assumptions depend on. The useful result is a set of reconciled questions, rather than several unrelated calculator printouts.

    A concise list might identify three next actions: obtain an updated contractor scope, confirm the proposed land credit and document the rental-income assumptions. Give each action an owner and a target date. This creates a practical path toward a review even when the project is still being developed.

    Distinguish readiness from certainty

    Readiness means the project can be explained and the open issues can be identified. It does not require pretending that every estimate is final. A concept-stage budget can be useful when its limitations are stated. Problems arise when a preliminary allowance is presented as a fixed price, or an expected approval is described as already issued.

    Use a consistent status vocabulary: available, under review, requested, unresolved or superseded. Add a short note where a missing item could change cost, timing or repayment. For example, a revised utility estimate may affect both the hard-cost budget and the expected start date. Keep that connection visible in the summary rather than burying it in a separate attachment.

    The scope checker confirms only the entered category, business purpose, amount and term against the supplied boundaries. It cannot evaluate the contractor, sponsor, location, valuation or approval documents. Review the project-type guide if an apparent match is being treated as evidence of qualification.

    Check the package for contradictions

    Read the project summary, budget, draw schedule and exit model side by side. Compare the unit count, loan amount, construction duration and repayment strategy. If one file assumes a rental building and another assumes individual condo sales, resolve the difference. If a revised budget changes the loan request, update the relevant schedule and explain the resulting contribution requirement.

    Check amounts as well as labels. An interest allowance in project uses should not be added again as an entirely new cost when presenting an updated draw estimate. A payoff figure should identify whether fees or interest are included. Land equity should not also appear as cash ready to pay invoices unless a separate, documented funding source actually creates that cash.

    Give the reviewer a short reconciliation note when assumptions differ intentionally. For example, a stressed exit case may use lower proceeds than the base case. Label it as a sensitivity test and preserve the original assumptions. The budget guide and exit guide explain how those calculations connect.

    Keep sensitive information in the right channel

    The checklist runs in your browser. It does not upload documents, save checked items or create an application. The calculators also process their assumptions locally. Printing or exporting a result creates a file you control; review that file before sharing it with anyone.

    For a financing conversation, start with a clear project description and ask which secure channel should receive private supporting records. Do not place account details or identity documents into calculator fields or public links. Keep a record of what was shared and which version it supported. The existing construction scenario form is a separate intake path, and calculator assumptions are not automatically transferred to it.

    Turn the checklist into a follow-up plan

    Check an item after reviewing the supporting evidence, rather than after merely creating a folder. Print the guide and checklist when you need a dated working record. Refreshing clears the selections, so keep a separate task list for continuing work. If the plan changes, reassess the affected items instead of assuming that a previously complete checklist remains complete.

    End the preparation process by identifying the next decision that matters most. It may be accepting a revised construction scope, confirming a funding source, or testing whether repayment remains plausible. Attach the unanswered questions to the current package. That makes a review easier to act on and gives the next conversation a clear purpose.

    Frequently asked questions

    Does matching the stated ranges mean approval?

    No. The stated project types, unit counts, loan amounts and terms are only the supplied scope. They do not replace a transaction review. The guide does not provide a current rate sheet or a complete eligibility policy.

    Can the entire commitment pay contractors immediately?

    Do not assume it can. Ask for the proposed closing advance, draw process and any holdbacks. Map invoice timing to expected funding so a reimbursement delay does not become an unexplained cash need.

    Is an extension part of the delay calculation?

    No. The delay tool calculates additional interest and entered carrying costs. It does not grant an extension, model extension fees or establish that additional reserves will be funded.

    Does the checklist save or upload my documents?

    No. Checked items remain only in the current page and clear when it refreshes. The checklist does not upload documents or submit an application. Print a working record if needed, and use a separately confirmed secure channel for private supporting records.

    Your preparation, in one place

    Return to the complete construction hub.

    Revisit the assumptions, compare another scenario, and keep your project evidence current.

    Back to the hub ← Previous: Plan the exit

    Updated November 2, 2026 · Published by Jaken Finance Group. General references are linked beside the relevant discussion; bank and credit-union guidance does not establish this product’s terms. Product parameters are from the supplied brief and have not been independently confirmed as a current offer.

    Have your project and assumptions ready?Discuss financing with Jaken Finance Group

    FREE INVESTOR RESOURCE

    Unlock your download

    Submit your email to download your results. Your deal inputs stay in this browser.

    Submit your email to access this free resource. Privacy policy.